My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 6 EAST MACARTHUR PLACE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
75B - 6 EAST MACARTHUR PLACE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:23 PM
Creation date
5/13/2009 1:55:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii) Strong seismic ground shaking? (No Substantial Change from Previous Analysis) <br />The EIR included mitigation measures designed to minimize impacts due to strong seismic <br />ground shaking. No changes have occurred in this area from the analysis provided in the EIR. <br />The development of the project will have no new or more severe impacts beyond those addressed <br />and mitigated in the EIR. <br />ZIZ) Seismic-related ground failure, including liquefaction? (No Substantial Change from Previous <br />Analysis) <br />The EIR included mitigation measures designed to minimize impacts due to seismic-related <br />ground failure. No changes have occurred in this area from the analysis provided in the EIR. The <br />development of the project will have no new or more severe impacts beyond those addressed and <br />mitigated in the EIR. <br />iv) Landslides? (No Substantial Change from Previous Analysis) <br />The EIR included mitigation measures designed to minimize impacts due to landslides. No <br />changes have occurred in this area from the analysis provided in the EIR. The development of the <br />project will have no new or more severe impacts beyond those addressed and mitigated in the <br />EIR. <br />b) Result in substantial soil erosion or the loss of topsoil? (No Substantial Change from Previous <br />Analysis) <br />The EIR included mitigation measures designed to minimize impacts due to soil erosion or loss of <br />topsoil. The following Mitigation Measure is from the EIR and will reduce erosion. <br />Mitigation Measure G-1 -During grading operations, the project applicant shall ensure special <br />handling of on-site soils as required by the City of Santa Ana due to the high moisture content of <br />the soils, which is well above optimum moisture conditions. The City of Santa Ana shall monitor <br />the grading contractor to ensure stabilization of the soils during grading prior to placing and <br />compacting fill soils over wet subgrade soils, as recommended in the geotechnical investigation <br />prepared by Geotechnical Professionals, Inc. <br />Implementation of mitigation measures in the EIR will reduce project impacts relating to erosion to a <br />less than significant level. Thus, development of the project will have no new or more severe impacts <br />beyond those addressed and mitigated in the EIR. <br />c) Be located on geologic unit or soil that is unstable or that would become unstable as a result of the <br />project and potentially result in onsite or offsite landslide, lateral spreading, subsidence, liquefaction <br />or collapse? (No Substantial Change from Previous Analysis) <br />The EIR included mitigation measures designed to minimize impacts due to unstable soil. No changes <br />have occurred in this area from the analysis provided in the EIR. The development of the project will <br />have no new or more severe impacts beyond those addressed and mitigated in the EIR. <br />d) Be located on expansive soil as defined in Table 18-1-B of the Uniform Building Code (1994) creating <br />substantial risks to life or property? (No Substantial Change from Previous Analysis) <br />The EIR included mitigation measures designed to minimize impacts relating to expansive soil. No <br />changes have occurred in this area from the analysis provided in the EIR. The development of the <br />project will have no new or more severe impacts beyond those addressed and mitigated in the EIR. <br />MacArthur Place South ~ ~~~~ <br />EIR Addendum c~ <br />36 <br />75B-71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.