Laserfiche WebLink
ZOA No. 2009-04, CUP No. 2009-08, <br />Amend DA No. 05-02 and VA No. 2009-02 <br />April 13, 2009 <br />Page 7 <br />area and the buildings architectural design were discussed. Although <br />several of the Commissioners concerns were resolved at the meeting, the <br />applicant has elected not to make any additional changes to the plan as <br />a result of the issues raised at the study session. <br />The proposed hotel use within the MacArthur Place South will remain in <br />compliance with the policies outlined in the General Plan Land Use <br />Element and will continue to promote this area as an active, vibrant <br />urban center. <br />Therefore, based upon an analysis of the project and the project's <br />compatibility with the City's General Plan and applicable development <br />standards, staff recommends that the Planning Commission recommend that <br />the City Council approve Zoning Ordinance Amendment No. 2009-04, Amendment <br />to Development Agreement No. 2005-02, Addendum to the Final Environmental <br />Impact Report No. 2004-02 and approve the mitigation monitoring program, <br />Conditional Use Permit No. 2009-08 as conditioned and Variance No. 2009-02 <br />as conditioned (Exhibits 12 through 15) <br />CEQA Compliance <br />In accordance with the California Environmental Quality Act, the <br />recommended actions have been reviewed through an Addendum to the <br />previously certified Environmental Impact Report 2004-02. CEQA <br />guidelines (California Code of Regulations 15000, et seq.) authorizes <br />the use of an addendum for the purpose of making minor or technical <br />changes, as long as these changes do not rise to the level of requiring <br />a subsequent or supplemental EIR pursuant to CEQA Guidelines 15162. <br />The originally certified Environmental Impact Report was analyzed in <br />light of the revised site plan and it was determined that there are no <br />new significant impacts resulting from the changed plan. Several <br />mitigation measures that required modification and/or further <br />clarification have been added to the conditions of approval for this <br />project (Exhibit 16). <br />Additionally, a new traffic study was performed to analyze the potential <br />changes in traffic circulation as a result in the changed land uses from <br />residential, restaurant and retail to hotel uses. The result of the <br />traffic analysis concluded that the hotel use at this site will result <br />in 83 fewer trips in the morning peak hour, 105 fewer trips in the <br />afternoon peak hour and 758 fewer trips on a daily basis (Exhibit 17), <br />thus requiring no additional review or mitigation measures. <br />75B-9 <br />