My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
25C - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:07 PM
Creation date
5/13/2009 3:38:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the monthly irrigation budget as detailed in the Monthly Water <br />Conservation Report Estimated Applied Water (EAW) requirements (see <br />Attachment 6). Failure to get approval from the Park Service's Utility <br />Coordinator prior to exceeding the monthly irrigation budget will result <br />in the Contractor to pay for the excess water. <br />(5) When an irrigation system does not adequately provide water to the turf <br />area in which it is installed, due to any reason including but not limited <br />to controller failure, valve failure, broken heads, poor system design, <br />etc., the Contractor shall provide supplemental irrigation at no extra cost <br />to the City. The Contractor may use any reasonable means necessary to <br />uniformly irrigate turf areas. <br />(6) Should the Contractor not respond to signs of turf stress immediately, the <br />Director, in his sole discretion, may dispatch his own staff to remedy the <br />stress and deduct the cost form the monthly invoice submitted by <br />Contractor. <br />(7) Automatic irrigation shall be conducted between the hours of 10:00 p.m. <br />and 4:00 a.m. and shall be programmed not to exceed the EAW. In the <br />event that Contractors water consumption exceeds the EAW City may <br />deduct said overages from the Contractor's monthly invoice. <br />(8) Contractor shall ensure that all staff working on irrigation possess one of <br />the following certifications: <br />a. California Landscape Contractor's Certified Landscape Technician <br />Program <br />b. Fullerton College Certificate of Proficiency in Landscape Irrigation <br />c. UC Riverside Certificate in Landscape Irrigation <br />fl <br />Weed Control-all turf <br />The Contractor shall keep all turf, casual and sport/priority turf, free of all turf <br />type weeds, especially Dallis Grass, Goose Grass, Poa Annua, Neddle Grass and <br />broadleaf weeds at all times. The Contractor shall, along with the monthly <br />Pesticide Use report, submit a written schedule for weed abatement in turf <br />specifying the method, day and location where weed abatement will be <br />performed. The Director's Representative will review and approve written <br />schedule taking into consideration the park's use. <br />(1) Contractor shall apply approved pre-emergent herbicides to all turf areas <br />in order to control the germination of noxious weeds i.e. Dallis Grass, <br />Goose Grass, Crab Grass, Nutsedge, Plantain, Oxalis, etc. <br />(2) Should turf type or broadleaf weeds germinate, the Contractor shall <br />control the weeds immediately upon recognition by way of selective <br />and/or broad-spectrum post emergent herbicides approved by the <br />Director. <br />16 <br />25C-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.