My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
25C - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:07 PM
Creation date
5/13/2009 3:38:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d) Fertilization <br />(1) Cycad and Palms shall be fertilized two (2) times per year in March and <br />September with Nutricote 13-5-11 total 3-stage controlled release palm <br />fertilizer at the manufacturer's recommended rate. <br />e) Hazardous Tree Reporting <br />In the event the Contractor detects any tree displaying roots heaving or girdling <br />(either by roots or a foreign material), leaning, broken or hanging limbs, or if <br />Contractor determines that potential safety hazard may exist Contractor shall <br />notify the Director by phone within twenty-four (24) hours. <br />f) Loss of Trees <br />The Contractor shall be responsible for the complete removal and replacement <br />of any and all trees lost due to the Contractor's failure to perform under this <br />agreement. Failure to perform includes but is not limited to, girdling trees with <br />string trimmers or tree ties, improper planting of new trees, improper <br />pruning/trimming techniques which disfigure or destroy the trees natural <br />integrity and shape, or failure to detect and prevent treatable diseases and insect <br />infestations. <br />All trees that exhibit the signs of disease or any other signs of distress shall be <br />inspected by a Certified Arborist approved by the Director. Should the Certified <br />Arborist determine that the tree had a terminal disease that the Contractor could <br />not have treated or prevented, the Contractor shall not be responsible to replace <br />the tree. However, should the Certified Arborist determine that the tree's <br />unhealthy condition or death could have been prevented had the Contractor <br />treated the tree then Contractor shall be responsible for the cost of treatment to <br />restore the tree to a healthy condition or replace the tree. The latest American <br />Shade Tree Conference guidelines for value determination will determine the <br />value of the trees lost. <br />By entering into agreement with the City the Contractor acknowledges that they <br />accept the condition of each tree and should a tree go into decline or expire the <br />Contractor agrees to replace the tree with like species and size or agree that the <br />City shall withhold payment equal to the value of the tree. <br />Perennial/Annual Color <br />All perennial/annual color beds shall be maintained and planted/rotated four (4) times <br />per year as detailed in Attachment 5. Annual color is part of the base bid and not part <br />of the plant cap. For every rotation 150 flats are planted in annual planting areas. <br />Vine Planting, Establishment and Maintenance <br />21 <br />25C-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.