My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
25C - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:07 PM
Creation date
5/13/2009 3:38:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(including pre-existing) in the turf surrounding the playground/tot-lots (high <br />pressure water blasting or sod cutting, leveling and re-sodding are approved <br />methods), and trash and other undesirable material. Rubberized fall areas shall <br />be cleaned of sand and debris daily. Any sand that accumulates on the <br />rubberized surface shall be reused. Sand and debris on the playground <br />equipment shall be removed. <br />b) The City shall be responsible for all playground equipment and tot-lot area <br />safety inspections. <br />11. Ball Diamond Maintenance <br />The Contractor shall retain asub-contractor to provide ball diamond infield <br />maintenance as set forth in Attachment 1. IT IS THE INTENT OF THIS <br />AGREEMENT THAT THESE FACILITIES BE MAINTAINED SO THAT <br />PLAYER SAFETY AND THE QUALITY OF PLAY ARE CONTINUOUSLY <br />ENHANCED. <br />a) Baseball Perimeter Maintenance <br />Ball diamond perimeter maintenance shall be performed daily. Ball diamond <br />perimeter maintenance shall be defined as all areas outside the field of play and <br />sideline/dugout areas where coaches, players and others associated with the <br />game gather. Ball diamond perimeter maintenance areas shall include but is not <br />limited to grandstands, areas around concession stands, fence lines, warm-up <br />areas, etc. The work that shall be performed on a daily basis shall include <br />picking up trash and debris, blowing off areas/hosing down areas using a high <br />pressure nozzle to remove brick dust, stains and/or any other foreign material, <br />such as sunflower seeds or peanut shells, so that all areas, including pavement <br />and landscape areas, are 100% free and clean. <br />b) Daily Outfield Maintenance <br />(1) Irrigation checks and repairs to assure that irrigation heads are at the <br />proper grade to avoid injury to players who may fall on them and that no <br />"slippery" areas exist. <br />(2) Fill in of divots and depressions and all uneven areas with #20 white silica <br />sand, organic compost mixed with LaPrima XD Bermuda grass seed <br />during the spring/summer and Stover Grand Slam perennial rye grass seed <br />during the fall winter to re-establish the areas. <br />(3) Level fence line areas using a rock or leveling rake. <br />(4) Level and drag warning track areas using nail drag followed by finishing <br />drag mats. Contractor shall apply new brick dust to fence lines and <br />warning tracks as necessary to maintain consistent '/z" layer of brick dust <br />in these areas. <br />26 <br />25C-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.