My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - PARK LANDSCAPE MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
25C - PARK LANDSCAPE MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:20:07 PM
Creation date
5/13/2009 3:38:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) All sport Courts shall be washed down every other week to remove dust, gum <br />and stains. The courts shall have water removed immediately following the <br />washing down. <br />c) Contractor shall replace tennis and basketball nets when they become worn. <br />The City shall furnish nets. <br />14. General Maintenance and Clean-up For All Parks and Contracted Sites <br />a) All trash and debris on the ground or in trash receptacles shall be removed from <br />all worksites each day Monday through Sunday before 12:00 p.m. This includes <br />all landscape areas, paved areas, street curb gutters, flood control channels, etc. <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not absorbed <br />by planting. This shall be done as often as required to maintain a neat <br />appearance. <br />c) After heavy windstorms or other inclement weather that impacts sites under this <br />agreement, the Contractor shall bring in extra staff to clean all parks areas within <br />two (2) days at no cost to the City. Debris, such as but not limited to, litter, <br />fallen branches, trash, limbs, branches, soil erosion, etc., shall be removed from <br />the worksites. <br />d) The Contractor shall keep sidewalks and all other paved areas swept and free of <br />any debris, dirt, glass, weeds, leaves, etc. at all times. <br />e) Drain inlets shall be checked and if necessary cleaned once per day to avoid <br />flooding of areas during inclement weather. <br />15. Other Requirements <br />a) Work Not Scheduled <br />The Director may delete a portion of or the entire work site from contractual <br />maintenance during a construction period or any period where the Director <br />determines that work cannot be scheduled. The deletion of this portion of work <br />will be reflected as a reduction in the monthly payment to the Contractor. The <br />amount of reduction will be based on the percentage of area involved and <br />agreed upon by the City and the Contractor in writing. <br />16. Special Maintenance <br />a) Annual City Employee Picnic at Birch Park -Once per year in August or <br />September the City holds their Employee Picnic at this park. On the day of the <br />picnic the Contractor shall provide one (1) Leadworker and two (2) employees <br />to help maintain the park during the course of the event. The event generally <br />starts at 10:00 am and ends at 2:00 pm. Maintenance duties during the event <br />shall include, but not be limited to, trash and litter pick-up, emptying trash <br />receptacles, cleaning up spills, washing down areas, brooming off areas, etc. <br />28 <br />25C-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.