Laserfiche WebLink
e) Re airs <br />The Contractor shall be responsible for repairs to all irrigation heads, swing joints and lateral <br />lines as a part of this agreement. "I'he Director will he responsible for repairs to the irrigation <br />system from the valve to the water meter. <br />9. Hardscape Maintenance <br />a) All paved areas, including but not limited to paved parking lots, curb gutters, <br />pool decks, stamped or other enriched hard surface areas, shall be thoroughly <br />cleaned once a week between Monday and Friday. Vacuums, blowers, <br />sweepers or other approved equipment may be used to clean hardscape areas. <br />Debris shall not be blown or swept onto adjacent streets or property. All debris <br />must be picked up by the Contractor and removed from the site. Debris and <br />litter that shall be cleaned includes, but is not limited to, leaves. twigs. branches, <br />trash, sand gravel, and worn asphalt. The City shall approve any equipment that <br />is to be used for cleaning hardscape. <br />b) Picnic facilities and park benches, including but not limited to picnic tables, <br />barbecues, benches, concrete pads and shelters shall be continuously maintained <br />in a safe and clean condition. <br />c) Pavement cleaning -Contractor shall perform pressure washing monthly to <br />remove dirt, stains, gum, tar, etc. from all paved pedestrian surfaces including <br />sport courts, sidewalks, picnic pads, paved areas around buildings, pedestrian <br />crosswalks in streets that are concrete or pavers, etc. <br />d) Site amenity cleaning -Contractor shall perform pressure washing of site <br />amenities, such as but not limited to, picnic tables, park benches, skate park, <br />walls, planters, raised curbing, railing, exterior of buildings, overhead shelters, <br />etc. <br />(]) All picnic amenities (picnic tables, b.b.q.s, picnic shelters, concrete picnic <br />pads, etc.) and park benches shall be cleaned every day Monday through <br />Sunday to assure that all trash, stains, spills, debris, glass, staples, nails, <br />tape, wire, etc. is removed. <br />(2) All picnic concrete paved areas and b.b.q.'s, park bench areas, patio areas, <br />and areas adjacent building entrances shall be cleaned once a month using <br />high pressure cleaning equipment. <br />(3) All barbecues shall have ashes, charcoal or any other materials removed <br />once a week. Following cleaning the Contractor shall paint the exterior of <br />the b.b.q.'s and the post with heat and rust resistant flat black paint. <br />24 <br />25C-116 <br />