My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
FULL PACKET_2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:19:53 PM
Creation date
5/13/2009 4:06:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(5) Power failures <br />(6) Underground wiring damage <br />Contractor will not be considered responsible for replacement. Contractor must demonstrate to <br />the satisfaction of Director that one of the above occurred in order to be excused from <br />performing under the Agreement. <br />B. Requests for Extra Work -The Director may request that the Contractor submit proposals <br />for extra work in order to improve the grounds-landscape in the contract sites. The Contractor <br />shall submit proposals using the Citys Proposal for Extra Work Spreadsheet (see Attachment <br />8). The Contractor shall complete the spreadsheet in its entirety using his/her proposed extra <br />work pricing (that is a part of this agreement) in order for the proposal to be considered. City <br />reserves the right to requests materials/equipment receipts with invoices. All labor shall be <br />quoted on a "not to exceed" basis and City will only pay for labor actually incurred. <br />31 <br />25C-123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.