Laserfiche WebLink
to low spots. The Contractor shall fill any remaining low spots with new Gail Materials <br />"Pro Gold with Stabilizer" brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag to <br />the contractor at weekly meetings with contractors <br />appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a'/2" min. depth and allow settling in <br />before play on field. <br />Note: Due to heavy watering and its need to settle before play, <br />staff shall provide a schedule of bi-monthly scarify/cut <br />and level drag dates to contractor. <br />10.0 Work to be Completed '`ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br />Citv's annual Sports Turf Renovation Schedule. fields renovated may change from <br />vear to veae. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br />drag built up amounts of materials at high spots and cut and level drag <br />the scarified material to low spots. The Contractor shall fill any <br />remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br />brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag at <br />the November meeting with contractor's owner (as per <br />section 6.3 of contract). <br />10. ] .2 Contractor shall verify all base distances, pitching rubber distances and <br />pitching mound heights per the Little League, Pony/Colt League <br />specifications for each specific field. Contractor shall repair any <br />specifications not being met on any field. <br />10.13 In addition, contractor shall install 1/2" new Gail Materials ``Pro-gold <br />with Stabilizer" (brickdust) to in-fields at all diamonds (minimum 26 <br />tons per Girls Softball/Major Little League Field and minimum 40 tons <br />per Junior/Senior Little League Field). Also, the contractor shall install a <br />minimum of 1 ton of Turface calcite clay per Girls Softball/Major Little <br />League Field and 2 tons of Turface calcite clay to Junior/Senior Little <br />League Fields Responsibility for and purchase of necessary materials <br />shall be at contractor's expense. <br />Note: The City has the right to move brickdust and Turface <br />materials to other infields under this agreement should <br />38 <br />25C-130 <br />