Laserfiche WebLink
(2) Ground cover shall not encroach into lawns, shrubs, adjacent desirable <br />bare areas, curbs, wall fixtures, furniture, beneath and/or into other <br />plants, etc. All sites shall be cleaned following each edging/detailing, <br />including streets. <br />b) Mulching of Bare Areas <br />In all groundcover areas where bare soil is visible or where the groundcover is <br />thin so the soil is visible, the Contractor shall apply Aguinaga Black Forest <br />Floor Mulch or approved equal, size 0" to 1 `'/z", ''/z" thick minimum every other <br />month starting in January during the third week as necessary to maintain <br />uniform and complete coverage. Mulch is to be maintained within its <br />boundaries. <br />c) Fertilization <br />The Contractor shall fertilize all groundcover areas four (4) times per year in <br />\I~u-~h..lune. Scptci»hrr. ~~nd I)cccmhcr ~~t t~~~~~ (?} p~~unds ~,f~actu~il nitr~~~~cn ~~cr <br />1.000 syuarc Icct u~in~~ ~l sl~~~~~ rclca~~ l~rtiliz~r u~in~, .I~I~~-1 \uU~i~nta Cuin~~lclc <br />S-?--1 sail c~nditiuncr plus N{'I~ slo~~~ release Icrtilizcr at a ral~ ~~I ci~~ht (~) <br />puunds of actual nih~ogen per 1,000 per square feet. <br />d) Replantin~T -Premium Plant Material <br />The Contractor shall plant each year, in any area determined by the Director, 2" <br />plugs of premium plant species at appropriate spacing so as to achieve complete <br />coverage once the plant is 2/3rds mature. The Contractor shall be responsible for <br />the complete removal and replacement of plants lost due to normal attrition or <br />due to Contractor's failure to perform under the terms of this Agreement. City <br />is responsible for cost of replacing plants lost to vandalism; however, Contractor <br />must prove that it was vandalism that killed the plant. See Attachment 7 for <br />plant cap. <br />e) Replanting -Standard Plant Material <br />The Contractor shall plant each year, in any area determined by the Director, 64 <br />count flats of standard plant species at a appropriate spacing so as to achieve <br />complete coverage once the plant is 2/3rds mature. The Contractor shall also be <br />responsible for the complete removal and replacement of plants lost due to <br />normal attrition or due to Contractor's failure to perform under the terms of this <br />Agreement. City is responsible for cost of replacing plants lost to vandalism; <br />however, Contractor must prove that it was vandalism that killed the plant. See <br />Attachment 7 for plant cap. <br />~s <br />25C-194 <br />