My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
FULL PACKET_2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:19:53 PM
Creation date
5/13/2009 4:06:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.14 TIME FOR COMPLETION <br />If awarded this project, the Contractor agrees to complete the work within the time parameters <br />jointly agreed upon by the City, SAPRF, and the Contractor prior to work commencement, <br />unless specific time deadlines are specified elsewhere in these specifications. Once the work <br />has commenced, the Contractor shall diligently prosecute the same to completion. <br />1.15 PAYMENTS WITHHELD/PENALTIES <br />Should the Contractor fail to finish the work as agreed upon in these specifications the <br />Contractor shall be charged by SAPRF penalties in the amount of five hundred dollars <br />($500.00) for each calendar day that the work remains incomplete beyond the dates specified. <br />Any amount so charged shall be deducted by the SAPRF from any monies which otherwise are <br />or become payable to the Contractor. <br />In case all the work called for is not completed in all parts and requirements within the time <br />specified, the SAPRF shall have the right to grant or deny an extension of time for completion, <br />as may be seen best to serve the interests of the SAPRF. The Contractor shall not be assessed <br />with penalties during the delay in the completion of the worl: caused be acts of God or of the <br />Public ~ncm~~. acts c~fthe State. il<x~ds. cpi~lemic~. ~lu,u~antinc. resU~ictic,ns. stril~e~. <~r unusually <br />SCV"~1'~ ~Aeat~lel'. ~ he 5;~~'~~l' 1'Cpl'CJCnlatlV'c AA~li~ ~l~~Cft~llll lilC ~i~ctJ anl~ 1~1L ~'\tCit L)~ the Ul:i:1\. <br />and their tindin<~s thereon shall be final and conclusive. <br />1.16 SU[3CONTRACTORS <br />Subcontractors used in the performance of this project shall be listed in the Contractors Bid <br />Proposal Subcontractors shall be properly licensed by the State of California as a contractor to <br />perform wort: of this specialty and hold a valid business permit and certificate of insurance <br />with the City of Santa Ana. Should any subcontractor tail to perform the work undertaken by <br />him to the satisfaction of the SAPRF, said subcontractor shall be removed immediately from <br />the project upon the request of the SAPRF and shall not again be employed on the project. The <br />Contractor shall be held liable for the correction of any deficient work. <br />1.17 ADDITIONS AND/OR DELETIONS OF WORK <br />The SAPRF representative reserves the right to add and/or delete tree work on this project as <br />deemed necessary and in the best interest of the SAPRF. Additions and/or deletions shall be <br />made at the unit price accepted by SAPRF upon award of contract. <br />1.18 INSPECTIONS <br />An authorized SAPRF representative will inspect the work performed by the contractor to <br />insure completion of the pruning in accordance with SAPRF Pruning specifications. Should <br />more than two (2) inspections be required on trees needing additional work, the contractor will <br />be billed for SAPRF staff time. <br />1.19 BILLING <br />Contractor shall submit a fully itemized bill listing each tree noting: <br />a. Address (each tree). <br />b. Type of tree. <br />c. Date completed. <br />d. Person completing the job. <br />e. Location of tree (front, side right, side left, rear) <br />5~ <br />25C-233 <br />
The URL can be used to link to this page
Your browser does not support the video tag.