My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
FULL PACKET_2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:19:53 PM
Creation date
5/13/2009 4:06:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) Contractor's supewisory personnel (Supervisors) shall have a combination of <br />five years experience or education in Ornamental Horticulture, Landscape <br />Architecture, Irrigation Technology or related science. Supervisors shall also <br />possess landscape/grounds management skills required to implement modern <br />methods and newly developed horticultural and arboriculture procedures and/or <br />practices. Supervisors shall accompany the Director on weekly inspection tours <br />of the contract sites. During the tour the Supervisor shall indicate the work <br />completed the previous week, any changes that were made or are being <br />contemplated and the work scheduled for the upcoming week and month. <br />b) The Contractor shall provide a Certified Irrigation Specialist in each district who <br />possesses, at minimum, a Certificate in "Ornamental Horticulture Certificate of <br />Proficiency Specialization in Landscape Irrigation" or holds a current California <br />Landscape Contractors Association "Certified Landscape Technician" <br />certificate to manage each sites irrigation systems controller programming, <br />performance and maintenance including, but not limited to, performing all <br />irrigation checks/report writing and to perform repairs and/or, modifications to <br />the irrigation system. You proposal will be evaluated on the qualifications of <br />this individual and the amount of FTE's you assign to each district. <br />c) The Contractor shall insure that all staff has a minimum of two years of <br />landscape maintenance experience or education. <br />d) The Director may request that the Contractor perform additional work or <br />services to meet the performance standards required by this Agreement. <br />e) Director may require Contractor to remove any employee from work sites at his <br />or her discretion. <br />4. Materials <br />a) The Contractor shall submit to the Director a list of all materials and/or <br />chemicals that may be used pursuant to the terms of this Agreement. The list <br />shall include Material Safety Data Sheets and chemical analysis where <br />applicable, recommended usage and any other manufacturers data that may be <br />pertinent. The list must be submitted before any materials/chemicals are used <br />pursuant to this Agreement. <br />b) The materials and chemicals utilized in furtherance of this Agreement shall <br />comply with the following standards: <br />(1) All fertilizers shall be complete, furnishing the required percentage of <br />nitrogen, phosphoric acid and potash to keep lawns, trees, shrubs and other <br />plants in a healthy and vigorous growing condition. <br />(2) Pesticides including but not limited to: Insecticides, fungicides, herbicides, <br />algaecides, aviacides, and rodenticides shall be of the best quality <br />obtainable and available on the market, properly labeled with guaranteed <br />12 <br />25C-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.