My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
05/18/2009
>
FULL PACKET_2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:19:53 PM
Creation date
5/13/2009 4:06:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/18/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contractor shall be responsible for mowing turf infields and other <br />designated ball diamond turf areas. (see Attachment l). <br />(2) The Contractor shall maintain mowers that provide a smooth, even cut <br />without ridges or depressions and without tearing of the leaf blades <br />(caused by unsharpened mower blades). Mowing shall be performed at <br />the speed the mowers manufacturer specifies to maximize quality of cut. <br />Mowing shall be performed with straight and flowing patterns approved <br />by the Director's Representative. The emphasis will be on quality <br />mowing vs. speed and unprofessional patterns. From time to time the <br />Director will direct the Contractor to change mowing pattern to <br />minimize rutting and compaction. The Contractor shall mow grasses <br />and broadleaf plants once per month in the Santiago Park Day Camp <br />(Nature Reserve) meadow area. <br />b) Ed~in~ and Detailing <br />All edging shall be performed with the use of a McClain's edger or approved <br />substitute. Stick edgers are not allowed. Contractor shall edge all turf adjacent <br />to all improved hard surfaces such as concrete, decomposed granite, asphalted <br />concrete paved areas. Edging/detailing shall be performed at the same time <br />mowing occurs. Chemical detailing of turf may occur with the Director's <br />approval. If chemical detailing is performed, the Contractor shall use the string <br />trimmer to remove the treated turf within one (1) week after symptoms of <br />phytotoxicity become recognizable. <br />(1) The Contractor shall use the McClain's edger to edge straight lines along <br />fences, walls, or long flowing arcs. The Director's Representative may <br />require the Contractor to use string lines to edge straight lines if the <br />Contractor's staff fails to achieve this quality without this method. <br />(2) The Contractor shall detail around trees, along walls/fences and other <br />park amenities first using a sharpened shovel cut to establish a concentric <br />round circle around trees, poles, etc. Once the initial detailed circle is <br />established a string trimmer may be used to maintain the circle. Should <br />the circle begin to deform the Director shall direct the Contractor to <br />repeat the detail process. <br />(3) The Contractor shall detail turf not greater than 10" away from walls or <br />fences. Detail lines shall be made straight and shall be maintained <br />straight. The Contractor shall, at his own cost, supply top soil and an <br />approved turf seed to reduce any existing bare soil areas along <br />walls/fences that are greater than 10". <br />c) Soil Testing Amending/Top Dressing <br />Contractor shall test the priority turf soil once per year in January by a soil- <br />testing laboratory approved by the Director. One soil sample shall be taken at <br />each ball diamond or soccer/football field and one every 5 acres of additional <br />i~ <br />25C-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.