Laserfiche WebLink
12.8 All infield turf edges including the arc skin line, base paths, pitchers mounds, etc., shall <br />be edged one (1) time per week. The edged lines shall be straight and, where curved <br />lines are required, the arcs will be a true radius. <br />13.0 General Contract Provisions <br />13.1 Contractor shall provide and is responsible for all equipment necessary to carry out the <br />work outlined in the contract. There will be no available storage for equipment. <br />Contractor will be responsible for bringing in and then removing all equipment <br />necessary to carry out the work outlined in the contract. <br />42 <br />25C-46 <br />