Laserfiche WebLink
55. During all site preparation, grading and construction, the project developer <br />shall ensure that the project contractor complies with all applicable <br />requirements of the NPDES permit, the Drainage Area Management Plan <br />(DAMP), and the City's Local Implementation Plan (LIP). BMP's from the <br />DAMP and the LIP will be implemented by the project contractors, as <br />appropriate during site preparation, grading and construction. <br />56. Prior to issuance of a grading permit, the project developer shall prepare a <br />Final Storm Water Pollution Prevention Plan (SWPPP). This plan shall be <br />submitted and approved by the City Engineer prior to initiation of any <br />grading activity. The project shall maintain the SWPPP on the <br />construction site throughout the construction period. <br />57. During all site preparation, grading and construction, the project developer <br />shall ensure that its contractor implements the provisions of the SWPPP. <br />58. Prior to the issuance of grading permits, the project developer shall submit <br />a Final Water Quality Management Plan (WQMP) based on the Final <br />Grading Plan, to be approved by the City's Director of Public Works. The <br />WQMP shall be consistent with the DAMP and shall contain provisions <br />and BMP's for construction and operation conditions. <br />59. Prior to the issuance of building permits, the project developer shall pay <br />the City's drainage impact fee. <br />60. Prior to the issuance of grading permits, the project developer shall verify <br />that structural BMP's have been permanently incorporated into project <br />plans. Such BMP s shall ensure that pollutants from project-related storm <br />water runoff are mitigated consistently with applicable state and local <br />standards. <br />61. Prior to issuance of grading permits, the project developer shall submit a <br />final drainage plan to the City identifying the exact size and location of <br />drainage facilities. <br />62. Prior to issuance of grading permits, the project developer shall provide <br />proof of an NPDES permit from RWQCB to the City for onsite dewatering <br />activities. <br />63. Prior to issuance of building permits for tenant improvements for <br />restaurant uses, the project developer shall ensure that the proposed <br />restaurants are fitted with grease interceptors to the size and capacity as <br />designated by the City of Santa Ana Building Division. <br />Resolution No. 2009-021 <br />Page 14 of 20 <br />