My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-022 - Conditional Use Permit No. 2005-10 as Conditioned for the Properties Located at 9 and 15 Macarthur Place
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-022 - Conditional Use Permit No. 2005-10 as Conditioned for the Properties Located at 9 and 15 Macarthur Place
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:25:54 PM
Creation date
5/14/2009 11:55:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-022
Date
5/4/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
79. Prior to issuance of a building permit, the project developer shall comply <br />with Senate Bill 50 and pay applicable school impact fees. Currently, the <br />Santa Ana Unified School District's adopted Fee Justification for <br />residential development is $2.14 per square foot and $0.33 per square <br />foot for commercial development. <br />80. Prior to issuance of a building permit, the project developer shall ensure <br />that the appropriate park Acquisition and Development Fee and parkland <br />dedication or in-lieu payments have been made. <br />81. Prior to issuance of building permits, the project developer shall submit a <br />Construction Phasing Plan to Santa Ana Fire Department. The plan must <br />be consistent with the Fire Department Fire Code requirements and must <br />show that emergency access to the construction site is adequate. <br />82. Prior to issuance of building permits, the project developer shall provide <br />evidence to the Santa Ana Fire Department that the proposed fire <br />protection and life saving systems incorporated in the project are <br />adequate. <br />83. Prior to issuance of building permits, the project developer shall submit the <br />final design of the project, including fire sprinklers system design to the <br />Santa Ana Fire Department for approval. <br />84. Prior to issuance of building permits, the project developer shall <br />coordinate with the Santa Ana Fire Department and the Santa Ana Police <br />Department regarding possible radio interference and installation of radio <br />repeaters on a tower rooftop. <br />85. Prior to issuance of building occupancy permits, the project developer in <br />cooperation with the City of Santa Ana, shall provide for the restriping of <br />the outside southbound through lane at the intersection of Main Street and <br />Sunflower to a shared through and right turn lane. <br />86. Prior to issuance of building occupancy permits, the project developer in <br />cooperation with the City of Santa Ana, shall provide for the restriping the <br />shared through right-turn lane at Hutton Centre Drive and MacArthur <br />Boulevard to provide an exclusive through lane and construct a second <br />northbound right turn lane for the northbound traffic. <br />87. Prior to issuance of building occupancy permits, the project developer <br />shall pay for the construction of a third eastbound through lane on <br />MacArthur Boulevard between Hutton Centre Drive/Imperial Promenade <br />and the SR-55 northbound on-ramp. <br />Resolution No. 2009-022 <br />Page 17 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.