My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-04 Regular
Clerk
>
Minutes
>
CITY COUNCIL
>
2000-2009
>
2009
>
2009-05-04 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:17:04 PM
Creation date
5/28/2009 9:55:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Minutes
Doc #
5-04-2009 REG
Date
5/4/2009
Destruction Year
PERM
Document Relationships
CLOSED_2009-05-04
(Supersedes)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2009\05/04/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
226 CONTRACT - WZ9435 XRT CHEMICAUBIOLOGICAL LEVEL 3 <br />CERTIFIED PROTECTIVE SUITS -With Blauer Manufacturing in an <br />amount not to exceed $2,021,608.13 -Police Department <br />Motion: <br />1. Award a contract to Econolite Traffic Engineering & Maintenance, <br />the lowest responsible bidder, in accordance with unit bid prices <br />in the amount not to exceed $70,000 for construction of Traffic <br />Signal Capital Improvement -Pedestrian Equipment Upgrade <br />project. <br />2. Approve a Funding Analysis with a total estimated construction <br />cost of $85,000. <br />236 CONTRACT AWARD FOR SUSAN STREET REHABILITATION <br />(PROJECT N0.09-1750-C) <br />Motion: <br />1. Award a contract to R. J. Noble Company, the lowest responsible <br />bidder, in accordance with unit bid prices in the estimated <br />amount of $593,867.90 for construction of Susan Street <br />Rehabilitation from Sunflower Avenue to MacArthur Boulevard. <br />2. Approve a Funding Analysis with a total estimated construction <br />cost of $831,380. <br />23C CONTRACT AWARD FOR BRISTOL STREET WIDENING FROM <br />MCFADDEN AVENUE TO PINE STREET (PROJECT NOS. 06-1500, 07- <br />3206, AND 09-3521) <br />Motion: <br />1. Award a contract to All American Asphalt, the lowest responsible <br />bidder, in accordance with unit bid prices in the estimated <br />amount of $8,315,754 for construction of Bristol Street Widening <br />from McFadden Avenue to Pine Street. <br />2. Approve a Funding Analysis with a total estimated construction <br />cost of $11,228,000. <br />CITY COUNCIL MINUTES 111 MAY 4, 2009 <br />23A CONTRACT AWARD FOR TRAFFIC SIGNAL CAPITAL IMPROVEMENT <br />- PEDESTRIAN EQUIPMENT UPGRADE (PROJECT NO. 08-2505-M) <br />
The URL can be used to link to this page
Your browser does not support the video tag.