My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - FY 09-10 BUDGET AND MISC FEES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
06/08/2009
>
75A - PH - FY 09-10 BUDGET AND MISC FEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:18:37 PM
Creation date
6/5/2009 10:33:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/8/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2009 <br /> PROPOSED <br />REVEN UE FY 08-09 FY 09-10 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br />SECTION V FIRE DEPARTMENT <br /> ABOVE & UNDERGROUND STORAGE TANK FEES <br />51502 Annual Tank Fees Each 391.50 403.00 <br /> (includes tanks not currently in use) <br /> Officially Abandoned Tanks <br />51502 Installation of New Underground Tanks: <br /> Flammable Liquids 1-3 Tanks 761.00 783.75 <br /> Each Add'1 Tank 228.00 234.75 <br /> Hazardous Chemicals Each Tank 304.00 313.00 <br /> /ncludes Plan Check, Resubmittals & Field Inspections <br /> (working hours) <br />51502 Above Ground Storage Tank Plan Review Per Tank 184.00 189.50 <br />51502 Systems Modifications/upgrades Per Hour 113.50 116.75 <br />51502 Miscellaneous Inspections <br /> Drafting Per Visit 113.50 116.75 <br /> Monitoring Certification Per Visit 113.50 116.75 <br /> Testing Product Lines Separately Per Visit 1 13.50 1 16.75 <br /> Unauthorized Releases Per Hour 113.50 116.75 <br />51502 Underground Storage Fees <br /> Tank Removal <br /> Tank Removal 1-3 Tanks 609.00 627.25 <br /> Each Additional Tank Per Tank 135.00 139.00 <br /> Field Inspection <br /> First three (3) hours Hour <br /> Each Additional hour or fraction Add'l Hour 113.50 116.75 <br />51502 Inspection(s) Required Due to Leaks or <br /> Unauthorized Releases <br /> Inspection <br /> Per Hour Hour 113.50 116.75 <br /> Each Additional hour or fraction Add'I Hour 113.50 116.75 <br />51502 Underground Storage Tank <br /> Regulations and Procedures Book Each 5.00 5.15 <br />51502 Site Remediation/Plan Check <br /> First 3 hours Hour 266.50 274.50 <br /> Each additional hour or fraction Add'1 Hour 113.50 1 16.75 <br />51502 Overtime Inspectors <br /> Inspection Hour 228.00 234.75 <br /> Minimum of (3) hours Hour 685.00 705.50 <br /> (Includes after 5 p.m. and weekends) <br />53502 HAZARDOUS MATERIALS RELEASE RESPONSE PLANS & INVENTORIES <br /> RANGE DETERMINATION <br /> Each business in the City of Santa Ana which is required to submit a business plan and/or inventory pursuant to Health & Safe ty <br /> Code, Chapter 6.95 of Division 20 ,shall be assigned a range consisting of a "range number" and a "ra nge letter" as follows: <br /> Range Numbers shall be based on the maximum quantity Range Letters shall be based upon the total number <br /> of all hazardous materials present on the business premises at of hazardous substances or waste categories listed on the <br /> any time in accordance with the following schedule: inventory of the business submitted to the City as follow s: <br />11 <br />75A-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.