Laserfiche WebLink
RESOLUTION 2009 <br /> <br />REVENUE PROPOSED <br /> <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE FY OS-09 FY 09-10 <br />UNIT <br /> FEES FEES <br />SECTION IX PLANNING & BUILDING AGENCY <br /> Models Only 100% <br /> All other identical plans 50% <br />5911 CHANGE INCORRECT ADDRESS E <br />h <br /> ac <br />52.50 54.05 <br /> Project <br />5911 CHANGE OWNER OR CONTRACTOR E <br />h <br /> ac <br />52.50 54.05 <br /> Project <br />098-01-3611 NOTICE OF VIOLATION AND <br /> NOTICE AND ORDER BONDS <br /> Prior to issuance of permits to correct work required by a <br /> Notice of Violation or Notice and Order, the Building Official <br /> may require a cash or surety bond as described in Sections <br /> 8-1769, 8-1770 and 8-1771 Santa Ana Municipal Code. The <br /> amount of the bond shall be established by the Building <br /> OfScial, but shall not be less than $200.00 for each Notice <br /> of Violation or Notice and Order. <br />011-01-5621-0508 ACCELERATED PLAN CHECK FEE Per H <br /> our 113.00 116.40 <br /> FIELD PLAN CHECK FEE Minimum Fee 77.00 79.30 <br /> Per Hour <br />5401 PRELIMINARY REVIEW OF BUILDING Minimum Fee 77.00 79 <br />30 <br /> STANDARDS COMPLIANCE . <br />Per Hour <br />098-0]-3611 SIGNS <br /> When a permit is required for an illuminated or non-illuminated <br /> sign, the owner shall provide the City a cash or surety bond <br /> as described in Section 8-1768 through 8-1771 of the Santa Ana <br /> Municipal Code. The amount of the bond shall be established <br /> by the Building Official, but shall not be less than $200 <br />00 <br />e <br /> . <br />p <br />r <br />address. <br />591 1 TEMPORARY CERTIFICATE OF OCCUPANCY <br /> Each Project 422.50 435.20 <br /> SPECIFIC CODE FEES AND CHARGES <br />59l 1 BUILDING CODE <br /> Any person desiring a permit required by the Building Code Each Permit 36 <br />75 <br /> <br />shall, at the time of filing an application fee of $6.55 . <br />37.85 <br /> towards the State Mandated Training Program and pay a fee <br /> equal to $31.30 plus the sum of the fees for the work to be <br /> done under the permit as set forth in the following schedule. <br /> There is no minimum fee for the issuance of a permit for <br /> single family residences and duplexes. <br />36 <br />75A-56 <br />