My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - FY 09-10 BUDGET AND MISC FEES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
06/08/2009
>
75A - PH - FY 09-10 BUDGET AND MISC FEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:18:37 PM
Creation date
6/5/2009 10:33:15 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/8/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2009- <br />PROPOSED** <br />REVENUE FY 08-09 FY 09-10 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br />SECTION XI PUBLIC WORKS AGENCY <br />86-01-5921 Paving, including Earthwork <br /> (0 - 2000 sq. ft.) Sq. Foot <br /> (Over 2000 sq. ft.) Sq. Foot <br /> Minimum <br />86-01-5921 Fencing <br /> Masonry, Concrete or Block <br /> $127.58 minimum Linear Foot <br /> Minimum <br />86-01-5621 Street Trees <br /> By Developer, Inspection Only Each <br />86-01-5921 Permanent Street Patch Guarantee <br /> Refundable if done in 30 calendar days Sq. Foot <br />86-01-5921 Projects Exceeding $50,000 & <=$100,000 and/or Percent of estimated <br /> Work items not included here construction costs <br />86-01-5921 Projects Exceeding $100,000 and/or Percent of estimated <br /> Work items not included here construction costs <br />86-01-5621 Overtime Rate for Construction Inspectors Per Hour <br /> Construction Inspector overtime rate range. Actual overtime hourly - <br /> rate based on Inspectors salary step <br />11-01-5577 Certificate of Correction Per Hour <br />11-01-5577 Covenants, Conditions, & Restrictions; Agreements and Per Hour <br /> Miscellaneous Checking <br />68-01-5223 Sign Removal from Public Right of Way Per Sign <br />68-01-5576 Sanitation Charge <br /> Bimonthly <br /> Single Family Per Unit <br /> Duplex Per Unit <br /> Triplex Per Unit <br /> Fourplex or larger Per Unit <br /> Business Per Unit <br /> NOTE.• Any portion of a building which is designed <br /> to be separately rentable and is separately identifrable <br /> by a letter or number designation shall constitute a <br /> separate and distinct unit, except that any publicly- <br /> owned building shall be a single unit. <br />86-01-5921 Survey Monument Check: 1st Monument Check Each <br /> Additional monument Each <br />86-01-5921 Uninitiated Street Work Permit Per Permit <br />* 0.36 <br />* 0.26 <br />* 142.00 <br />1.48 1.52 <br />123.85 127.58 <br />* 172.00 <br />31.20 32.14 <br />* 9.59% <br />* 7.00% <br />55.70-59.95 59.35-63.87 <br />* 158.00 <br />* 158.00 <br />26.03 26.81 <br />14.91 14.91 <br />14.91 14.91 <br />14.91 14.91 <br />14.91 14.91 <br />14.91 14.91 <br />* 803.00 <br />* 161.00 <br />Double Street Work Double Street Work <br />Permit Fee Permit Fee <br />60 <br />75A-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.