My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-025 - Final Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-025 - Final Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:26:00 PM
Creation date
6/18/2009 12:28:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-025
Date
5/18/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or endanger a fish, wildlife, or plant species. Therefore, the EIR, as addended, remains adequate and <br />complete. <br />b) Does the project have impacts that are individually limited, but cumulatively considerable? <br />("Cumulatively considerable " means that the incremental effects of a project are considerable when <br />viewed in connection with the effects of past projects, the effects of other current projects, and the <br />effects ofprobable future projects)? (No Substantial Change from Previous Analysis) <br />The EIR stated that the project would contribute cumulatively significant adverse emissions to the <br />South Coast Basin, which is already anon-attainment area. This impact is significant and adverse and <br />cannot be mitigated to levels of insignificance. The EIR also stated that the project would have <br />cumulative impacts regarding transportation and traffic due to the uncertainty and issues regarding fair- <br />share funding for mitigation measure T-6, regarding the construction of a two-lane metered on-ramp to <br />the SR-55 freeway. Due to the uncertainty of implementation, cumulative impacts were considered for <br />the year 2025. The project will have no new or more severe impacts beyond those addressed and <br />mitigated in the MacArthur Place South EIR. <br />c) Does the project have environmental effects that will cause substantial adverse effects on human <br />beings, either directly or indirectly? (No Substantial Change from Previous Analysis) <br />Mitigation measures have been provided in the MacArthur Place South EIR to reduce impacts. The <br />project will have no new or more severe impacts beyond those addressed and mitigated in the EIR. <br />Resolution No. 2009-025 <br />M a clr ~51~ l et:®`b o u t h <br />EIR Addendum <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.