Laserfiche WebLink
MAYOR <br />MlguetA. Putido <br />MAYOR PRO 7EM <br />Claudia C. Alvarez <br />COUNCiLMEMBERS <br />P. David Benavides <br />Carlos Bustamante <br />Michele Martinez <br />Vincent F, Sarmiento <br />Sal Tinajato <br />May d, 2049 <br />Mr. Mario Ghizzi <br />20 Civic Center Plata <br />Santa Ana, CA 92701 <br />Dear Mr. Ghizzi: <br />CITY 01= SANTA ANA <br />FIRE DEPARTMENT <br />1439 South Broadway <br />Santa Ana, Cal'rfornla 92707 <br />Ci7Y MANAGER <br />David N. Ream <br />CITY ATTORNEY <br />Joseph W.fletcher <br />CLERK OF THE COUNCIL <br />Patricia E. Healy <br />Subject: REQUIRED TRI-ANNUAL SECONDARY CONTAINMENT TESTING. <br />As per our phone conversation, Santa Ana Fire Stations 1, 4 and 5 are required to perform a secondary <br />containment test, also known as Senate Bill 9$9 or SB989, every three years. The testing for this system <br />consists of: hydrostatic testing far sumps, spill buckets and dispenser containtent boxes, a pressure test <br />on piping and ~a vacuum test on tank interstitial spaces. The last test for these three facilities was <br />conducted in December of 2005. !n order to avoid violations and comply with the Title 23, California <br />Code of Regulations, Chapter 16, section 2637, these facilities had conducted the required SB989 test by <br />Pacific Systems Electric in December of 2008. <br />]f you have any questions regarding this matter, please feel free to contact Christopher Ciraulo at (714) <br />bA7.5761. <br />Sincerely, <br />/l r• .~~ <br />CIdRISTOPHER CIRAUI.O, UST INSPECTOR <br />FIRE PREVENTION $UREAU <br />for MARC MARTIN, FIRE CHIEF <br />CC <br />25D-12 <br />