My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - UNDERGOUND FUEL TANK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
07/06/2009
>
25D - UNDERGOUND FUEL TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:18:14 PM
Creation date
7/1/2009 2:36:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
7/6/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Diesel Fuel System <br />OPW Diesel Nozzle $119.06 <br />Husky 3/4" Hose Break Away Device Diesel $125.15 <br />Goodyear 3/4" x 9' Diesel Fuel Hose $ 62.98 <br />Goodyear 3/a" x 6' Diesel Fuel Hose $ 44.76 <br />Fire Station # 5 <br />Veeder Root Leak Detection S stem <br />Steel Tank Interstitial Sensor $344.77 <br />Piping Sump Sensor $228.33 <br />Vapor Recovery System <br />Healy Standard 8' Coaxial Hose $168.25 <br />Healy Standard 4' Coax Hose $112.91 <br />Healy Break Away Device $144.21 <br />Healy 900 Series EVR Nozzle $468.40 <br />Husky Pressure Vacuum Vent Cap 5885 $247.39 <br />Diesel Fuel System <br />OPW Diesel Nozzle $119.06 <br />Husky 3/a" Hose Break Away Device Diesel $125.15 <br />Goodyear 3/a" x 9' Diesel Fuel Hose $ 62.98 <br />Goodyear 3/a" x 6' Diesel Fuel Hose $ 44.76 <br />Labor to remove the defective component(s) with replacement and testing of new component <br />shall be invoiced at the two hour minimum based on the technical labor rate of $66.00 per hour. <br />Travel time will be included. <br />Vapor recovery items are warranted by the manufacturer for one year due to defects in material <br />and workmanship. Manufacturers warranty on leak detection components are, part shall be free <br />of defects in material and workmanship for a period of one year. <br />I would appreciate answering any questions regarding this proposal. Thank you for the <br />opportunity to provide this quotation. It is always a pleasure to be of service to the City of Santa <br />Ana! <br />Sincerely, <br />,~ ~- ~ ~, <br />Dennis Minnock <br />25D-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.