Laserfiche WebLink
Pricing Summary/Scope of Work City of Santa Ana <br />Location : EI Salvador Center <br />Fire Alarm Detection Systems (Test and Inspect + Parts (non-peripheral, Quantity Frequency <br />8-51M-F)] <br />Audio/Visual Unit 16 Annual <br />Annunciator Panel 1 Annual <br />Fire Alarm Control Panel (Multiplex/Addressable) 1 Annual <br />Pull Station 10 Annual <br />Subtotal for Location EI Salvador Center : $1,974.85 <br />Location :Fire Station #1 <br />Fire Sprinkler Systems [Test and Inspect] Quantity Frequency <br />Wet/Dry pipe sprinkler inspection 1 Annual <br />( includes one riser ,tamper ,and flow ) <br />Fire Alarm Detection Systems [Test and Inspect + Parts (non-peripheral, Quan tity Frequency <br />8-5/M-F)] <br />AudioNisual Unit 18 Annual <br />Smoke Detector (Test/Inspect) 26 Annual <br />Annunciator Panel 1 Annual <br />Fire Alarm Control Panel (Multiplex/Addressable) 1 Annual <br />Heat Detector 6 Annual <br />Pull Station 5 Annual <br />Water Flow Switches (Electrical Test Only) 1 Annual <br />Sprinkler Tamper Switches (Electrical Test only) 1 Annual <br />Subtotal for Location Fire Station #1 : $2,738.10 <br />Location :Fire Station #9 <br />Fire Sprinkler Systems [Test and Inspect] Quantity Frequency <br />Wet/Dry pipe sprinkler inspection 1 Annual <br />( includes one riser ,tamper ,and flow ) <br />Fire Alarm Detection Systems [Test and Inspect + Parts (non-peripheral)] Quantity Frequency <br />Audio/Visual Unit 8 Annual <br />Smoke Detector (Test/lnspect) 30 Annual <br />Simplex 4001 (Fire Alarm Panel) 1 Annual <br />Water Flow Switches (Electrical Test Only) 1 Annual <br />Door Holder 5 Annual <br />Sprinkler Tamper Switches (Electrical Test only) 1 Annual <br />Subtotal for Location Fire Station #9 : $1,307.80 <br />Pricing. The pricing set forth in this Agreement is based on the number of devices to be installed as set forth in the <br />Scope of Work. If the actual number of devices installed is different than the number set forth in the Scope of Work, <br />the price will be adjusted accordingly. <br />20 <br />25E-22 <br />