My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - ORD - FEDERAL FLOODPLAIN MGMT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
07/20/2009
>
11A - ORD - FEDERAL FLOODPLAIN MGMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:17:47 PM
Creation date
7/15/2009 1:12:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
11A
Date
7/20/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Base Flood Elevation changes due to physical alterations: <br />a. Within 6 months of information becoming available or project <br />completion, whichever comes first, the floodplain administrator shall <br />submit or assure that the permit applicant submits technical or <br />scientific data to FEMA for a Letter of Map Revision (LOMR). <br />b. All LOMR's for flood control projects are approved prior to the issuance <br />of building permits. Building Permits must not be issued based on <br />Conditional Letters of Map Revision (CLOMR's). Approved CLOMR's <br />allow construction of the proposed flood control project and land <br />preparation as specified in the "start of construction" definition. <br />Such submissions are necessary so that upon confirmation of those physical <br />changes affecting flooding conditions, risk premium rates and floodplain <br />management requirements are based on current data. <br />(3) Changes in corporate boundaries: <br />Notify FEMA in writing whenever the corporate boundaries have been <br />modified by annexation or other means and include a copy of a map of the <br />community clearly delineating the new corporate limits. <br />(e) Documentation of Floodplain Development. <br />Obtain and maintain for public inspection and make available as needed the <br />following: <br />(1) Certification required by sections 7-17(c)(1) and 7-20 (lowest floor elevations); <br />(2) Certification required by section 7-17(c)(2) (elevation or floodproofing of <br />nonresidential structures); <br />(3) Certification required by section 7-14(c)(3) (wet floodproofing standard); <br />(4) Certification of elevation required by section 7-19(a)(3) (subdivisions and <br />other proposed development standards); <br />(5) Certification required by section 7-22(b) (floodway encroachments); and <br />(6) Maintain a record of all floodplain variance actions, including justification for <br />their issuance, and report such floodplain variances issued in its biennial <br />report submitted to the Federal Emergency Management Agency. <br />(f) Map Determination. <br />Ordinance No. NS-XXX <br />Page 14 of 27 <br />11A-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.