Laserfiche WebLink
1. Introduction <br />1.1 INTRODUCTION <br />This Final Environmental impact Report has been prepared in accordance with the California <br />Environmental Quality Act (CE QA) as amended (Public Resources Code Section 21000 et seq. and <br />CEQA Guidelines (California Administrative Code Section 15000 et seq.. <br />According to CEQA Guidelines Section 15132, the Final EiR shall consist of: <br />(a ) The Draft Environmental Impact Report (Draft EIR) or a revision of the Draft; <br />(b) C orn me nts and recommendartions received on the Draft El either verbatim or in summary; <br />c) A list of persons, organizations, and public agencies comments on the Draft EIR; <br />d The responses of the Lead Agency to significant environmental points raised in the review and <br />consultation process; and <br />e Any other information added by the Lead Agency. 9;01)k <br />This document contains responses to comments received on the Fairhaven/Lincoln and Santa <br />Clara/Lincoln intersection Modifications, Draft Supplement to the Santa Ana Second Main Track Project <br />EIR (Draft EIR ). These comments were received during the public review period, which commenced on <br />March E3, 2009, and closed on April 6, 2009. This document has been prepared in accordance with <br />CE QA and the CEQA Guidelines and represents the independent judgment of the Lead Agency. This <br />document and the circulated Draft Supplement to the EiR comprise the Final Supplement to the EiR <br />(Final SEIR, in accordance with the CE0A Guidelines, Section 15132. <br />1.2 FORMAT of THE FINAL EIR <br />This document is organized as follows: <br />Section I., Introduction. This section describes CE0A requirements and the content of this Final SEIR. <br />Section 2, Response to Comments. This section provides a fist of agencies and interested persons <br />commenting on the Draft SEIR, copies of the comment letters received during the public review period, <br />and individual responses to written comments. To facilitate revi ew of the responses, each comment letter <br />has been reproduced and assigned a number A -1 through A -. Individual comments have been <br />numbered for each letter and the letter is followed by responses with references to the corresponding <br />comment number. <br />Section 3. Revisions to the Draft SEIR. This section contains revisions to the Draft S EIR tent and figures <br />as a result of: 1 comments received by agencies and interested persons as described in Section ; and <br />changes, errors and /or omissions discovered after to release of the Draft SEIR for public review. <br />Final Supplement to the Santa Ana Second Main Track Project EIR City of Santa A rya a Page I - I <br />&irlavenl�eo a a i co Intersection Modifications The Planning Center #April 2009 <br />souiono. l <br />Page 118 of 130 <br />