Laserfiche WebLink
2. Response to Comments <br />LETTER Al — State Department of Transportation I page) <br />DEPARTMENT OF TRANSPORTATION <br />+ _ <br />District 12 <br />.1337 hlididson 1�tivc_ Suite 380 <br />lrviuc. CA 926121-8894 <br />I'm: (9.19) 724 -2592 <br />V_ft Cr r# <br />-arch 12,21109 <br />David orY011110 <br />City of Santa Am <br />0 Civic Cent r .111 a <br />Santa Ana, CA 92702 <br />1GFJQEQA <br />SCH4- 2008101006 <br />Lag . 2140B <br />SR-22 <br />bject: Pai rbaven /Lin oln and Santa Clara/Lincoln .intersection Wood` fi tiions <br />.4r lr, R_k%ndolfllio, <br />Tb nk you for the opportunity tQ mwlew and a m mun[ on the Fairhaven/Lincoln and Santa. <br />Clara /Uneoln Intersection Modification Pro.. et. The project. consists of intensection and. roadway <br />improvements aicrng Lincoln Avenue to mmedy design and safety t ads. The nearest State roift to <br />the project site is R- . <br />The California Department ofTranspoitation (Department), District 12 is ommie ct.ing agpency on tli?s <br />project and Nvc havc no comment at this time. flowever, in. tile event of Im activity v ithirn the <br />D epartmen t's righ t -(w way, an en c vo aehment permit w i I [ be required. <br />Please t ontinue to keep us -informed of this project and any future developments, which could <br />p 0 te nt ia I ly i'm pact State tra .�po rt.aUon faciiitics. if yogi havii any questions oi"nccd to. co mac t its, please <br />do not hesitate to cal l Dann on Davis at (94 9) 440- 348 7. <br />1-71 <br />C its Herre,Branch Chicf <br />Local 1 ev l T iineiii/Interitov tninent l Review <br />C=: `Ferry R u I Y., r1 , Offlev cif P[annijig and es�eAwIi <br />" C 11tr em.s J Vfpf.rrw 3 mabddy acir ,r ('al tr vma " <br />A7 -1 <br />Q,doplk <br />ef7j <br />Final Supplement to the Santa Ana Second Main Wrack Rroj'ect EIR City of Santa Ana • Page 2 - <br />ai ha venl incol a and Santa ClaralLincoln Intersection Modifications The Planning 'en e 1'u Iii r WV 9 -034 <br />so o N <br />Page 121 of 130 <br />