Laserfiche WebLink
1. Executive Summary <br />i* l INTRODUCTION <br />The California Environmental Quality Act (CE 0A) requires that local government agencies, prier to taping <br />action on projects over which they have discretionary approval authority, consider the environmental <br />consequences of such projects. An Environmental Impact Report (EIR ) is a public document designed to <br />provide the public and kcal and state governmental agency decision makers ith an analysis of potential <br />environmental consequences to support informed decision making. This Supplement to the previously <br />certified Santa Ana Second Main Track Environmental Impact Report (State Clearinghouse No. 2900991 065) <br />addresses the environmental effects associated with the implementation of the proposed Fairhaven /Lincoln <br />and Santa Clara /Lincoln Intersection Modifications project. <br />A Supplement to an E I R EIR is prepared when an El has been certified for a project and the Iead agency <br />determines, on the basis of substantial evidence, that one or more of the criteria listed under Section 15163 <br />of the State CE OA Guidelines are met. A S E I R augrnents a previously certified E I R to the extent necessary to <br />address the changed project or environmental conditions and to examine mitigation and project alternatives <br />accord ingIy. Under Section 1 5103 of the CE QA Guidelines, a S El requires that only changes to the project <br />that would potential ly result in significant irnpacts and that were not evaluated ire the certified E I R be inclu led <br />in the environmental analysis. The City of Santa Ana, as Lead Agency for the next discretionary action <br />associated with this project, is responsible for preparing environmental documentation in accordance with <br />the California Environmental Qual ity Act CEA, as amended. The City of Santa Ana has determined that <br />preparation of a Supplement to an E I R (California God of Reg ulations, Title 14, Division 6, Chapter 3, Article <br />11 is appropriate. This Draft S E I R has been prepared pursuant to the requirements of CEQA and the City of <br />Santa Ana's CEA procedures. The City of Santa Ana has reviewed and revised as necessary all submitted <br />drafts, technical studies, and reports to reflect its own independent judgment, including reliance on <br />applicable City technical personnel from other and review of all technical reports. <br />I its role as Lead Agency for this project, the City of Santa Ana prepared and circulated an Initial Study and <br />Notice of Preparation (NOP) to the State Clearinghouse, responsible agencies, and interested parties (public <br />review period October 3, 2008, to November 2, 2008). The project was changed prior to release of the Draft <br />SEIR, so a reprised NOP was circulated for another -day public review period (January 2, 2909, to <br />February 20, 2009) . The two NOPs and the IS are included in Appendix A; all comments received during <br />public review are included in Appendix B. <br />In accordance with Section 15163(b) of the CE QA Guidelines, this Supplement to an EIR only contains <br />iinforrnatiion necessary to supplement the 2002 E I R in order to evaluate the changes to the original project. <br />No other changes to the previously certified El are required. Data for this Draft SEIR was obtained from on- <br />site field observations, discussions with affected agencies, analysis of adopted plans and policies, review of <br />available studies, reports, data and similar literature, and specialized environmental assessments. <br />1.2 ENWR NMENTAL PROCEDURES <br />This Draft SElR has been prepared pursuant to C E A to assess the environmental effects associated with <br />implementation of the proposed project, as well as anticipated future discretionary actions and approvals. <br />The six main objectives of this document as established by CEQA are listed below- <br />FairbavenlLincoln and Santa ClaralLincoln Intersection Modifications City of Santa Ana s Page I -I <br />Supplement o the Santa Ana Second Main Nyack Project r1R Resolution No. 2009 -034 <br />Page 13 of 130 <br />