My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-034 (2) - Final Supplemental Environmental Impact Report for Fairhaven/Lincoln
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-034 (2) - Final Supplemental Environmental Impact Report for Fairhaven/Lincoln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2015 1:21:03 PM
Creation date
7/20/2009 5:23:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-034
Date
7/6/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Environmental Analysis <br />iE <br />environment is currently disrupted by approximately eight trains that travel on the Oran a oun <br />These noise levels already exceed City noise ordinance standards. While the frequency and duration of train <br />noise is low, approximately one train every hour, the magnitude of noise from the trains is high <br />(approximate l 115 dBA at 50 feet) . Noise from construction activities would be higher than an <br />er�viror�rx�ent a�ppro�cirnatery dB at 0 feet without trains. ambient nose <br />Given the current schedule of nigh time trains <br />however, construction noise would not result in a substantial noise increase over existing conditions. <br />Construction equipment noise world be substantially lower than the m nitud 9 ons, <br />trains and therefore nighttime construction significant of noise generated by the <br />ors noise world not be a significant nose impact. <br />5.2.5 Cumulative Impacts <br />Cumulative noise impacts occur when multiple sources of noise, though individually not substantial combine <br />and lead to excessive cumulative noise exposure at noise - sensitive uses. <br />Short- Terra Construction Phase Activities <br />Cumulative construction noise impacts have the potential to occur when multiple construction ' <br />roects in the <br />same general area generate noise within the same time frame and contribute p � <br />to the increases �n the ambient <br />noise environment. No other construction activities are proposed in the project vicinity. Furthermore, the City <br />of Santa Ana allows for the generation of construction noise during the daytime hours. Bas d n noise levels <br />generated by construction activities associated with the proposed project site, the duration of construction <br />activities, and the presence of high magnitude of train horn noise, construction noise from the proposed <br />project would not significantly contribute to the cumulative noise environment. p <br />Long -Term Operational Phase Activities <br />The project - related traffic circulation and associated traffic noise levels represents the project's cumulative <br />contribution to increases in the ambient noise environment along roadway segments analyzed. Traffic noise <br />produced by project - related vehicles would not grange and mould not contribute to any possible future <br />noise increases in the area. In consideration of the preceding factors, the project's contribution to cumulative <br />noise would be less than significant, and therefore, project impacts would not be cumulatively considerable. <br />5,2.6 Existing Regulations and Standard on it ons <br />• City of Santa Ana Municipal Code, Article 111, Morse Control. <br />5.2.7 Level of Significance Before Mitigation <br />Upon implementation of regulatory requirements and standard conditions of approval, impact 5.2-1 and <br />Impact 5.2-2 world be less than significant. <br />5.2:8 Mitigation Measures <br />No mitigation measures are required. <br />5.2.9 Level of Significance After Mitigation <br />Noise impacts would be less than significant and no mitigation measures are required. <br />Based on Metrol ink and Amtrak passenger trains and BN F freight projections from the 2002 EIR. <br />FairhavenlLincoln and Santa ClaralLincoln Intersection Modifications City of Santa 4 e 5.2 -11 <br />Supplement ,3upplement to tbeSanta Ana Second Main Track Project I <br />L <br />Resolution No. 2009 -034 <br />Page 77 of 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.