of floor finish. All spray buff solution shall be removed from baseboards, furniture, trash
<br />receptacles, etc.
<br />X. WINDOW CLEANING
<br />Completely remove dust, cobwebs, smudges, tapes, oil film and other types of soil from all
<br />interior and exterior windows and partitions. A solution of glass cleaner, window squeegee
<br />tool with rubber blade, clean sponge and clean cloths are to be used. Remove drip and slash
<br />marks from all adjacent surfaces. Glass in open space and office partitions are included in this
<br />project.
<br />Y. SWEEP OUTSIDE PATIO. BALCONIES AND BUILDING ENTRYWAYS
<br />Clean cobwebs from overhead surfaces and lights affixed to the building entryway areas. This
<br />includes cleaning the exterior of doors, door thresholds, and hardware. Sweep exterior patios.
<br />Z. CLEAN ENTRANCE GLASS
<br />Clean both sides of all building entry door glass and entry doors for a uniform appearance free
<br />of all smudges, fingerprints, stains, streaks, lint, etc. Remove all paper and tape surfaces.
<br />AA. MACHINE SCRUB GLAZED TILE AND STONE FLOORS
<br />Apply the approved cleaning solution compatible with type of surface, and allow it to stand
<br />before scrubbing the surface with a floor buffer equipped with a scrubbing pad. Deep cleaning
<br />is to be performed in a manner to remove heary stains, mildew and mineral deposits from the
<br />surface. After scrubbing, the surface will be rinsed thoroughly to remove all remaining
<br />cleaning solution. After cleaning, the floor and grout will have a uniform appearance free
<br />from film, mineral deposits, corrosion stains, etc. Areas not accessible with the buffer will be
<br />manually scrubbed with an abrasive pad. Apply sealer to the areas after machine scrubbing,
<br />except in shower areas.
<br />BB. EMPTY TRASH IN OUTSIDE PATIOS, BALCONIES, ENTRY DOOR AREAS
<br />Empty trash receptacles in patio and balcony areas. Clean receptacle as needed each time.
<br />This includes receptacles that may be placed outside any entry doors.
<br />CC.BREAK DOWN CARDBOARD BOXES
<br />Cardboard cartons are to be broken down flat and put into the proper trash container.
<br />DD. SPOT CLEAN CEILINGS
<br />Remove toilet paper wads, cobwebs, dust build up, and other debris from the ceiling.
<br />EE. DUST WALLS AND CEILINGS
<br />Use a lightly treated dust cloth, lamb's wool dusting tool, upright or tank vacuums with
<br />dusting attachment, or combination of these tools to remove all dirt, lint, litter, dry soil, etc.,
<br />from wall and ceiling.
<br />FF. SAFETY AND PRECAUTIONARY MEASURES
<br />Contactor shall secure work area and equipment to prevent passage by the general public and
<br />City staff, and shall denote it as such. Work area and equipment shall stay under that
<br />condition until work is complete, equipment is vacated, and passage is safe by the general
<br />public and City employees. The proper quantity and type of safety signs, such as "Caution -
<br />Wet Floor" will be placed by the Contractor's employees every time conditions warrant such
<br />signs. Signs will be provided by the Contractor. Signs are to be picked up and stored in the
<br />proper janitor room once the condition no longer exists to warrant such signs.
<br />GG. HIGH DUSTING
<br />Remove dust, cobwebs, oily film, etc., from all fixtures and surfaces above ten (10) feet from
<br />the top of the floor. This includes lights, grills, light fixtures, pipes, sprinkler system, cables,
<br />ledges, walls, ceilings, vents, etc. High dusting shall be accomplished by using treated dust
<br />25C-20
<br />
|