Laserfiche WebLink
EXHIBIT "A" <br />COST ESTIMATE <br />Date Revised: 06/02/09 <br />Redhill Rehabilitation: Alton to Deere <br />NO. DESCRIPTIpN UNIT L~ANTITY UNIT PRICE COST <br />1 Mobilization LS 1 $8,730.00 $8,730.00 <br />2 Traffic Control LS 1 $10,475.00 $10,475.00 <br />3 Traffic Striping, Markers and Markings LS 1 $2,619.00 $2,619.00 <br />4 Remove Existing Curb & Gutter LF 1,039 $10.00 $10,390.00 <br />5 Remove Existing Sidewalk and Ramps SF 2,422 $2.00 $4,844.00 <br />6 Construct 5" Thick AC Leveling Course TON 883 $68.00 $60,044.00 <br />7 Construct 19" Thick Aggregate Base TON 3,216 $17.00 $54,672.00 <br /> Roadway Excavation (Remove Existing AC <br /> Pavement & Aggregate Base Course) to a 26" <br />8 depth CY 2,268 $28.00 $63,504.00 <br /> Construct 2" Thick Asphalt Rubber Hot Mix <br />9 (ARHM) Wearing Course TON 353 $80.00 $28,240.00 <br /> Adjust Storm Drain Manhole Frame and Cover to <br />10 Grade Per City of Santa Ana Std. Plan No. 307 EA 5 $575.00 $2,875.00 <br /> Construct Concrete Sidewalk Per City Of Santa <br />] 1 Ana Std. Plan No. 1104. SF 1,565 $5.00 $7,825.00 <br /> Construct Type A-2-8 Curb & Gutter Per City Of <br />12 Santa Ana Std. Plan No. 1101. LF 1,039 $30.00 $31,170.00 <br /> Construct Type 1 Curb Ramp Per City Of Santa <br />13 Ana Std. Plan No. 1122 SF 857 $7.00 $5,999.00 <br /> Construct Concrete Bus Pad Per City of Santa Ana <br />14 Std. Plan No. 1108 SF 691 $9.00 $6,219.00 <br />15 Install Traffic Loop Detectors EA 17 $200.00 $3,400.00 <br />16 Adjust Traffic Signal Pull Box to Grade EA 2 $375.00 $750.00 <br />17 Relocate Traffic Signal Pull Box EA 1 $7,000.00 $7,000.00 <br />18 Install Traffic Signal Pull Box EA 1 $640.00 $640.00 <br /> Extend Underground 2-1/2" Conduit and Install <br />19 New DLC Wiring for Advanced Traffic Loops LF 168 $24.00 $4,032.00 <br /> Replace and Adjust Water Valve Frame and Cover <br /> to Grade Per City of Santa Ana Std. Plan No. <br />20 1410A EA 7 $625.00 $4,375.00 <br />21 Project Information Signs EA 1 $489.00 $489.00 <br />22 Prepare and Implement SWPPP LS 1 $873.00 $873.00 <br />SCIBTOTAL `319, ! 65.00 <br /> <br />TOTAL <br />$351,065.00 <br />-6- <br />25E-8 <br />