Laserfiche WebLink
KDM <br />I <br />M ERIDIAN <br />Prevailing Wage <br />Fee Schedule <br />Valid Through October 1, 2009 <br />PROFESSIONAL SERVICES: <br />HOURLY RATE: <br />Additional Survey Vehicle <br />$ 75/day <br />Principal <br />$180.00 <br />Project Manager <br />$160.00 <br />Project Surveyor <br />$140.00 <br />- Project Engineer <br />$140.00 <br />Junior Engineer <br />$125.00 <br />Survey Technician <br />$115.00 <br />Engineering Technician <br />$115.00 <br />AutoCAD Drafter/Designer <br />$100.00 <br />Clerical/Administration <br />$ 75.00 <br />Technical Aide <br />$ 75.00 <br />Expert Witness (4 hour minimum) <br />$300.00 <br />Survey Crew (1 man w/truck) $175.00 <br />Survey Crew (2 persons) $225.00 <br />Survey Crew GPS (3 persons) $300.00 <br />Survey Crew GPS (4 persons) $375.00 <br />REIMBURSABLES: <br />RATE: <br />Additional Survey Vehicle <br />$ 75/day <br />Supplies, Reproduction, Rental of Special Equipment <br />Cost + 15% <br />Subconsultants <br />Cost + 15% <br />REMOTE SITES: RATE: <br />Fuel, lodging, Airfare Cost + 15% <br />Meal Expense $ 50/daylperson <br />Mileage $ 0.55/mile <br />Note: Government Agencies and/or private landowner fees, map filings, research <br />materials, etc. are extra to contract costs. <br />These rates are dependant on prevailing wage rates as determined by the Director of <br />the Department of Industrial Relations. Interim changes will negate these rates and an <br />adjusted fee schedule will be issued, and shall apply should this occur. <br />Overtime pay will be charged at a rate of 150% as shown above. Double time pay will <br />be charged at a rate of 200% as shown above. <br />22541 Aspan Street, Suite C, Lake Forest, California 92630 <br />Telephone: 949.768-0731 Facsimile: 949-768-3731 <br />KDMMeridian.com <br />