My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - TRAFFIC SIGNAL AND STREET LIGHTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
08/17/2009
>
25A - TRAFFIC SIGNAL AND STREET LIGHTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:17:18 PM
Creation date
8/6/2009 3:37:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25A
Date
8/17/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50. Vacuum Truck <br />Addendum No. I July 9, 2009 <br />$ (~ /job trip <br />IV. Cellular Phone /Radio Equipment <br />The Contractor shall provide four (4) cellular phone for City staffs use during this <br />contract (two for traffic signal maintenance and two for street light maintenance) to <br />facilitate communication with the Contractor at the Contractor's cost. <br />V. Bid Scenario -Street Light <br />For comparison purposes please bid the repair scenario utilizing the previous bid <br />prices. <br />The City of Santa Ana has experienced a street lighting outage in a neighborhood with <br />series high voltage street lighting. The outage encompasses several streets in the <br />neighborhood affecting 24 cast iron double king street lights. with 2500 lumen lamps. A <br />night drive was required to identify the scope of the outage. The lighting repairs required <br />three (3} working days to complete the repairs. After completion of USA markings, the <br />following personnel, equipment and materials were dispatched to repair the lighting. <br />1. Two service personnel: Lead High Voltage Street Light Technician and a Service <br />Laborer for three days. <br />cost: 3 , ~.I-{ t~ <br />2. Night Drive: <br />Cost: QS <br />3. Equipment: Service truck with a compressor for three days. <br />cost: t-{-c~.3 <br />4. Materials Used: <br />3001f. of # 8 neoprene high voltage wiring <br />2 ea. #5 pull boxes, <br />3 ea. #3 pull boxes <br />19 ea, compression fittings <br />15 ea. bags of rock <br />6 ea. 250066G, 2500 lumen lamps <br />6 ea. Cut out disks <br />Supplier Cost: (~ • ~ g _ <br />Markup: ~ -? t 3 ~ <br />Total Material Cost:Jr4c~ ~ (~ <br />Total Cost (item 1-4): S. 1--} , ~ Cj5 ~ E i~-- <br />Page4of16 <br />25A-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.