Laserfiche WebLink
GROUP' <br />GROUP DELTA CONSULTANTS, INC. <br />2008 FEE SCHEDULE <br />DELTA <br />HOURLY CHARGES FOR PERSONNEL <br />SENIOR PRINCIPAL ENGINEER /GEOLOGIST $214 <br />a,ll, PRINCIPAL ENGINEER /GEOLOGIST $171 <br />ASSOCIATE ENGINEER/GEOLOGIST — <br />SENIOR ENGINEER/GEOLOGIST $138 <br />PROJECT ENGINEER/GEOLOGIST <br />�».�..�., $124 <br />STAFF ENGINEER /GEOLOGIST $109 <br />SENIOR TECHNICIAN/PREVAILING WAGE — <br />r,r� TECHNICIAN $90 <br />DESI GNER/ILLUSTRATOR /AUT OCAD $81 <br />TECHNICAL SUPPORT $62 <br />CHARGES FOR EQUIPMENT <br />VEHICLE: <br />Vehicles $ 8.00/hour <br />Mileage $ 0.51 /mile <br />NUCLEAR DENSITY GAUGE $ 8.00/hour <br />OTHER CHARGES <br />Outside services will be charged at cost plus 15 percent. <br />Technician and support personnel time for work over eight (8) hours per day <br />will be charged at 1.25 times the regular rates. Holidays and weekends hours <br />(all hours) will be charged 1.50 times the regular rates. <br />LITIGATION FEES <br />Fees for participation in deposition, arbitration, trial, etc., will be charged at an <br />hourly rate of $300.00 per hour, 4 -hour minimum, portal to portal. <br />Group Delta Consultant's' fee is based on current rates because their work will be primarily accomplished in 2009. <br />