My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IRVINE, CITY OF (3) -2009
Clerk
>
Contracts / Agreements
>
I
>
IRVINE, CITY OF (3) -2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:50:56 PM
Creation date
8/10/2009 3:07:51 PM
Metadata
Fields
Template:
Contracts
Company Name
IRVINE, CITY OF
Contract #
A-2009-115
Agency
PUBLIC WORKS
Council Approval Date
8/3/2009
Expiration Date
6/30/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A"-COST ESTIMATE <br />RPAh~II Rehahilitatinn: Alton to Deere <br />N4. DESCRIPTION ' _ UNIT QUANTITY UNIT I'RYCE COST' <br />1 Mobilization LS 1 $3,110.00 $3,110.00 <br />2 Traffic Control LS 1 $3,730.00 $3,730.00 <br />3 Traffic Striping, Markers and Markings LS 1 $933.00 $933.00 <br />4 Remove Existing Curb & Gutter LF 300 $10.00 $3,000.00 <br />5 Remove Existing Sidewalk and Ramps SF 800 $2.00 $1,600.00 <br />6 Construct 5" Thick AC Leveling Course TON 300 $68.00 $20,400.00 <br />7 Construct 19" Thick Aggregate Base TON 1,200 $17.00 $20,400.00 <br /> Roadway Excavation (Remove Existing AC <br /> Pavement & Aggregate Base Course) to a 26" <br />8 depth CY 800 $28.00 $22,400.00 <br /> Construct 2" Thick Asphalt Rubber Hot Mix <br /> (ARHM) Wearing Course TON 100 $80.00 $8,000.00 <br /> Adjust Storm Drain Manhole Frame and <br /> Cover to Grade Per City of Santa Ana Std. <br />10 Plan No. 307 EA 2 $575.00 $1,150.00 <br /> Construct Concrete Sidewalk Per City Of <br />11 Santa Ana Std. Plan No. 1104. SF S00 $5.00 $2,500.00 <br /> Construct Type A-2-8 Curb & Gutter Per City <br />12 Of Santa Ana Std. Plan No. 1101. LF 350 $30.00 $10,500.00 <br /> Construct Type 1 Curb Ramp Per City Of <br />13 Santa Ana Std. Plan No. 1122 SF 150 $7.00 $1,050.00 <br /> Construct Concrete Bus Pad Per City of Santa <br />14 Ana Std. Plan No. 1108 SF 250 $9.00 $2,250.00 <br />15 Install Traffic Loop Detectors EA 5 $200.00 $1,000.00 <br />16 Adjust Traffic Signal Pull Box to Grade EA 2 $375.00 $750.00 <br />17 Relocate Traffic Signal Pull Box EA 1 $7,000.00 $7,000.00 <br />18 Install Traffic Signal Pull Box EA 1 $640.00 $640.00 <br /> Extend Underground 2-1/2" Conduit and <br /> Install New DLC Wiring for Advanced Traffic <br />19 Loops LF 50 $24.00 $1,200.00 <br /> Replace and Adjust Water Valve Frame and <br /> Cover to Grade Per City of Santa Ana Std. <br />20 Plan No. 1410A EA 1 $625.00 $625.00 <br />21 Project Information Signs EA 1 $489.00 $489.00 <br />22 Prepare and Implement SWPPP _ LS 1 _____$873.00 __$873.00 <br /> SUBTOTAL ~ _ ~ 113,600.00 <br />__ <br />1(~°~ Contingency __ _ _ _ _ `~ l 1.4(10.00 <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.