My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MERCHANTS LANDSCAPE SERVICES 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MERCHANTS LANDSCAPE SERVICES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 4:53:03 PM
Creation date
8/14/2009 8:39:50 AM
Metadata
Fields
Template:
Contracts
Company Name
MERCHANTS LANDSCAPE SERVICES
Contract #
A-2009-053
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
5/18/2009
Expiration Date
6/30/2010
Insurance Exp Date
7/1/2010
Destruction Year
2015
Notes
Amended by A-2009-170, A-2009-193, A-2010-098, A-2011-043
Document Relationships
MERCHANTS LANDSCAPE SERVICES 2A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2C
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES, INC. 2D
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.4.4 Infield Sopper with Wringer and Bucket: Used to collect standing water <br />in brickdust areas. Sopper shall be geotextile- covered sponge typical for <br />absorbing chemical spills. <br />6.0 Meetings <br />6.1 Contractor shall provide City of Santa Ana staff with a contact person and a phone <br />number to reach the contact person from the hours of 6:30am — 5:00pm, Monday — <br />Saturday. <br />6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor ". This <br />site supervisor shall meet with staff one (1) time per week at a time and place agreed <br />upon by both parties for as long as the contract is in effect to discuss any <br />problems /concerns that may arise and any goals for the day /week. <br />6.3 In November of each year for as long as the contract is in effect, Contractor shall <br />personally meet with staff, along with the designated site supervisor, to discuss and <br />outline schedules for "Annual Renovations" (listed in Section 10.0). <br />7.0 Daily Infield Maintenance <br />7.1 General <br />7.1.1 Contractor shall remove all litter, broken glass and hazardous debris <br />from infield and dugout areas. <br />7.1.2 Contractor shall keep brickdust and dugout areas in a weed free <br />condition. <br />7.1.3 Contractor shall hose and/or sweep and hose out all dugouts so they are <br />100% free of brickdust or any other debris. <br />7.2 Maintenance Procedure <br />7.2.1 Retain smooth and level playing surface, using the following daily <br />procedure. The contractor shall remove all bases before beginning any <br />work on in -field and re- install after all work on in -field is completed. <br />7.2.2 After removing all bases, the contractor shall scrape /wire brush all base <br />post anchors and base inserts. This will help facilitate the base removal <br />and installation. <br />7.2.3 The Contractor shall rake /shovel loose material from high spots back <br />into low spots /worn areas on running paths, sliding zones, and any other <br />low spots /wom areas appearing on the field before any watering or <br />dragging shall take place <br />7.3 Home Plate Area/Batters Box Area Holes <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.