My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MERCHANTS LANDSCAPE SERVICES 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MERCHANTS LANDSCAPE SERVICES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 4:53:03 PM
Creation date
8/14/2009 8:39:50 AM
Metadata
Fields
Template:
Contracts
Company Name
MERCHANTS LANDSCAPE SERVICES
Contract #
A-2009-053
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
5/18/2009
Expiration Date
6/30/2010
Insurance Exp Date
7/1/2010
Destruction Year
2015
Notes
Amended by A-2009-170, A-2009-193, A-2010-098, A-2011-043
Document Relationships
MERCHANTS LANDSCAPE SERVICES 2A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES 2C
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
MERCHANTS LANDSCAPE SERVICES, INC. 2D
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\M-N (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.1.1 Remove all standing water from low spots either by skimming off excess <br />water and spreading it out to dry areas or using a pump /sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials <br />from stock to all Wet Areas and Rake Out. <br />9.0 Work to be Completed "BI- MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag <br />built up amounts of materials at high spots and cut and level drag the scarified material <br />to low spots. The Contractor shall fill any remaining low spots with new Gail Materials <br />"Pro Gold with Stabilizer" brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify /cut and level drag to <br />the contractor at weekly meetings with contractors <br />appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a 1/2" min. depth and allow settling in <br />before play on field. <br />Note: Due to heavy watering and its need to settle before play, <br />staff shall provide a schedule of bi- monthly scarify /cut <br />and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br />City's Annual Sports Turf Renovation Schedule. Fields renovated may change from <br />year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br />drag built up amounts of materials at high spots and cut and level drag <br />the scarified material to low spots. The Contractor shall fill any <br />remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br />brickdust from stock and make level. <br />Note: Staff shall identify areas to scarify /cut and level drag at <br />the November meeting with contractor's owner (as per <br />section 6.3 of contract). <br />10.1.2 Contractor shall verify all base distances, pitching rubber distances and <br />pitching mound heights per the Little League, Pony /Colt League <br />specifications for each specific field. Contractor shall repair any <br />specifications not being met on any field. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.