My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC BUILDING CARE INC 4 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
PACIFIC BUILDING CARE INC 4 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:49:44 PM
Creation date
8/21/2009 2:03:36 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC BUILDING CARE INC
Contract #
A-2009-112
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
8/3/2009
Expiration Date
6/30/2011
Insurance Exp Date
3/17/2011
Destruction Year
2018
Notes
Amended by A-2011-185, -01, A-2012-158
Document Relationships
COMMERCIAL CLEANING SYSTEMS (FORMERLY PACIFIC BUILDING CARE, INC.) 4C - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
PACIFIC BUILDING CARE INC. AKA COMMERCIAL CLEANING SYSTEMS, INC. 4b - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
PACIFIC BUILDING CARE INC. 4A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />JANITORIAL MAINTENANCE SERVICES <br />LIBRARIES AND PARK CENTERS <br />GENERAL SCOPE OF WORK <br />The Contractor shall furnish all supervision, labor, equipment, materials, and supplies required to perform <br />janitorial services at various locations. <br />➢ Work performed at properties listed in this specification will be administered by the Finance <br />Department — Building Maintenance Division and are subject to work hours and standards listed <br />in the specification. <br />The following terms and conditions pertain to this specification in its entirety. <br />1.0 QUALITY CONTROL <br />1.1 Quality Control Program: Submitted your QUALITY CONTROL PROGRAM as part of <br />your proposal and include at a minimum, the following: <br />1. Weekly and monthly inspection system reports covering all the services listed in this <br />RFP. It shall specify each office, room and/or general area listed in this RFP and its <br />observed state of cleanliness. <br />2. Methods for identifying and correcting deficiencies in quality of service. <br />3. Contractor shall maintain a file of inspections conducted and when applicable, take <br />corrective action. A copy of each inspection and documented corrective action shall be <br />delivered to the Property & Facilities Manager within seven (7) calendar days from the <br />date of inspection. <br />4. Detail staff overseeing the quality control program. <br />2.0 BUILDING SECURITY <br />The contractor shall keep all exterior doors locked during the performance of work or as otherwise directed <br />and shall ensure that all doors are locked at the end of the shift unless otherwise noted. Offices with <br />security systems shall be activated immediately after work is completed in that area. The Contractor shall <br />be responsible for any lost keys, card keys and any inherent damages (i.e., re -keying of the whole facility). <br />This cost shall be withheld from payment(s). The decision to re -key the whole facility is solely that of the <br />City's Facilities Maintenance Superintendent. <br />3.0 EQUIPMENT USAGE <br />There shall be no usage of city equipment, telephones, or facilities by the contractor's staff except for a <br />telephone designated for business use by City staff or as otherwise allowed by City staff coordinating this <br />contract. The City may ask the contractor to remove staff from the site if they are found to be in violation <br />of this policy. Electrical power (110) volts will be furnished by the City as existing power outlets for the <br />contractor's use to operate such equipment necessary in the conduct of his work. The Contractor shall be <br />responsible for any damage caused to the electrical outlets and their covers caused by improper <br />disconnection of equipment. Hot and cold water will also be made available as necessary for cleaning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.