My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PACIFIC BUILDING CARE INC 4 - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
PACIFIC BUILDING CARE INC 4 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 2:49:44 PM
Creation date
8/21/2009 2:03:36 PM
Metadata
Fields
Template:
Contracts
Company Name
PACIFIC BUILDING CARE INC
Contract #
A-2009-112
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
8/3/2009
Expiration Date
6/30/2011
Insurance Exp Date
3/17/2011
Destruction Year
2018
Notes
Amended by A-2011-185, -01, A-2012-158
Document Relationships
COMMERCIAL CLEANING SYSTEMS (FORMERLY PACIFIC BUILDING CARE, INC.) 4C - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
PACIFIC BUILDING CARE INC. AKA COMMERCIAL CLEANING SYSTEMS, INC. 4b - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
PACIFIC BUILDING CARE INC. 4A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stains. Clean out the tracks of the elliptical trainer with a dry towel only. Clean tops of <br />any rubber mats and under each treadmill by extra -vacuuming up the dust and black <br />motor powder. <br />9.29 Daily Safety and Precautionary Measures: Secure work area and equipment to prevent <br />passage by the general public and City staff, and denote it as such. Work area and <br />equipment shall stay under that condition until work is complete, equipment is vacated, <br />and passage is safe by the general public and City employees. The proper quantity and <br />type of safety signs, such as "caution, wet floor" shall be placed by the Contractor's <br />employees every time conditions exists that warrant such signs. Signs are to be picked up <br />and stored in the proper janitor room once the condition no longer exists to warrant such <br />signs. <br />9.30 Weekly Spray and Buffing of Hard Floors: Clean and restore a uniform glass and <br />protective finish to resilient tile or terrazzo floors that are finished with a floor finish. All <br />chairs, trash receptacles, etc., shall be tilted or moved where necessary to spray buff <br />underneath. The entire floor shall have a uniform coating of floor finish. All spray buff <br />solution shall be removed from baseboards, furniture, trash receptacles, etc. <br />9.31 Weekly Dusting of Blinds and Draperies: Clean all blinds, shades, and draperies. Care <br />shall be taken not to spread dust into the air. <br />9.32 Weekly Dusting of Ceiling Atrium Ledges Lunchroom Drywall Ledges and Wall <br />HVAC Vents: Clean all HVAC vents and area immediately surrounding them. Dust all <br />atrium ledges at the glass/wood railing areas and at the atrium stairs. Dust lunchroom <br />drywall ledges. Care shall be taken not to spread dust into the air. <br />9.33 Weekly High Dusting: Remove dust, cobwebs, oily film, etc., from all fixtures and <br />surfaces above 11 feet from the top of the floor. This includes light, grills, light fixtures, <br />pipes, sprinkler systems, cables, ledges, walls, atrium wood and ledges, ceilings, vents, <br />etc. Care shall be taken not to spread dust into the air. <br />9.34 Daily Cleaning of Lunchroom: The entire lunchrooms, including kitchen and cooking <br />area, dishwashing area, restrooms, eating areas, vending machines, hallway, glass and <br />painted doors, unlocked storage closets, and refrigerators are all included in this contract. <br />Areas should be cleaned so grease, dirt, food particles, trash and other litter are <br />thoroughly cleaned and removed from surfaces. This area needs to remain in a healthy <br />and clean environment on a daily basis. <br />9.35 Monthly Cleaning of Floors and Caroet: <br />9.35.1 Pile lift carpet in all areas <br />9.35.2 Spray buff tile floors <br />9.35.3 Strip and wax tile floors every quarter <br />9.35.4 Spin bonnet carpets every two (2) months (January, March, May, July, <br />September, and November) <br />9.35.5 Extract carpet two (2) times a year (April and October) <br />10:0 Floor Maintenance <br />Daily Preventive Gymnasium Floor Maintenance <br />A high level appearance and a safe surface underfoot requires scheduled, daily preventive maintenance. <br />Matting <br />Contractor shall provide and replace as often as necessary U.S. Matt & Rubber Corporation entrance guard <br />mats (or approved equal) at each outside and inside entry door directly leading into the gymnasium. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.