elliptical trainers, ski machine, bikes and stair stepper machines to remove sweat and
<br />stains. Clean out the tracks of the elliptical trainer with a dry towel only. Clean tops of
<br />any rubber mats and under each treadmill by extra - vacuuming up the dust and black
<br />motor powder.
<br />10.29 Daily Safety and Precautionary Measures: Secure work area and equipment to prevent
<br />passage by the general public and City staff, and denote it as such. Work area and
<br />equipment shall stay under that condition until work is complete, equipment is vacated,
<br />and passage is safe by the general public and City employees. The proper quantity and
<br />type of safety signs, such as "caution, wet floor" shall be placed by the Contractor's
<br />employees every time conditions exists that warrant such signs. Signs are to be picked up
<br />and stored in the proper janitor room once the condition no longer exists to warrant such
<br />signs.
<br />10.30 Weekly Spray and Buffing of Hard Floors: Clean and restore a uniform glass and
<br />protective finish to resilient tile or terrazzo floors that are finished with a floor finish. All
<br />chairs, trash receptacles, etc., shall be tilted or moved where necessary to spray buff
<br />underneath. The entire floor shall have a uniform coating of floor finish. All spray buff
<br />solution shall be removed from baseboards, furniture, trash receptacles, etc.
<br />10.31 Weekly Dusting of Blinds and Draperies: Clean all blinds, shades, and draperies. Care
<br />shall be taken not to spread dust into the air.
<br />10.32 Weekly Dusting of Ceiling Atrium Ledges Lunchroom Drywall Ledges and Wall
<br />HVAC Vents: Clean all HVAC vents and area immediately surrounding them. Dust all
<br />atrium ledges at the glass /wood railing areas and at the atrium stairs. Dust lunchroom
<br />drywall ledges. Care shall be taken not to spread dust into the air.
<br />10.33 Weekly High Dusting: Remove dust, cobwebs, oily film, etc., from all fixtures and
<br />surfaces above 11 feet from the top of the floor. This includes light, grills, light fixtures,
<br />pipes, sprinkler systems, cables, ledges, walls, atrium wood and ledges, ceilings, vents,
<br />etc. Care shall be taken not to spread dust into the air.
<br />10.34 Daily Cleaning of Lunchroom: The entire lunchrooms, including kitchen and cooking
<br />area, dishwashing area, restrooms, eating areas, vending machines, hallway, glass and
<br />painted doors, unlocked storage closets, and refrigerators are all included in this contract.
<br />Areas should be cleaned so grease, dirt, food particles, trash and other litter are
<br />thoroughly cleaned and removed from surfaces. This area needs to remain in a healthy
<br />and clean environment on a daily basis.
<br />10.35 Monthly Cleaning of Floors and Caret:
<br />11.35.1 Pile lift carpet in all areas
<br />11.35.2 Spray buff tile floors
<br />11.35.3 Strip and wax tile floors every quarter
<br />11.35.4 Spin bonnet carpets every two (2) months (January, March, May, July,
<br />September, and November)
<br />11.35.5 Extract carpet two (2) times a year (April and October)
<br />10.36 Parking Garage — Ross Annex Cleaning:
<br />11.36.1 Daily— Remove trash from trash receptacles: clean around the large trash bins
<br />11.36.2 Weekly — Remove any gum in the parking floor.
<br />11.36.3 Annually — Clean the floor with West extractor. (Work to be done at night
<br />or weekend).
<br />10.37 Council Chamber — City Hall
<br />
|