My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - ENERGY EFFICIENCY IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
25D - ENERGY EFFICIENCY IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:16:56 PM
Creation date
9/1/2009 2:52:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
9/8/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />1. SCOPE OF WORK <br />7.7. CONSTRUCTION <br />• Contractor to provide construction management for the Work described in this section <br />• Contractor shall co-ordinate with the City's personnel on construction activities, lay- <br />down areas, schedules and phasing of Work <br />• Contractor shall prepare a detailed project schedule with start and estimated comple- <br />tion date for each project included in the Scope of Work. Project schedules shall be <br />presented in Microsoft Project format <br />• Contractor shall provide weekly Progress Reports to the Facilities Maintenance Super- <br />visor or his designee <br />• Installation and modification of equipment shall conform with 2007 California Uniform <br />Building Code, 2007 California Mechanical Code, 2007 Plumbing Code, 2007 Electrical <br />Code, 2007 Fire Code. <br />• Projects included within this Scope of Work shall be inspected by the Facilities Main- <br />tenance Superintendent, or his designated representative, for final acceptance of func- <br />tionality and quality of work <br />• Contractor shall provide a 24 hour fire watch while fire systems are impaired due to <br />Contractor's provision of services <br />Contractor shall use the Lock-Out Tagout procedure during the performance of any <br />electrical work, and in relation to any source of energy <br />• Materials used to complete the Scope of Work shall be free of asbestos, lead, PCB and <br />other hazardous materials <br />Contractor is responsible for engineering of systems and related components. <br />• Contractor is responsible for the accuracy of measurements, estimates or materials, <br />quantities, sizes and site conditions that will affect the Scope of Work <br />• Contractor will patch paint to match existing finishes as required due to Contractor's <br />work. <br />• Contractor shall protect and restore penetrations of firewalls and fire-protections <br />• Contractor shall provide adequate dust management to protect furniture, flooring, com- <br />puters, books, etc <br />25D-21 <br />