My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - ENERGY EFFICIENCY IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
25D - ENERGY EFFICIENCY IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:16:56 PM
Creation date
9/1/2009 2:52:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
9/8/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />• Contractor will work with SCE to convert existing rate schedule to AL-2 rate sche- <br />dule <br />1.2. REBATE ADMINISTRATION <br />• Provide labor, paperwork and documentation to reserve, administer and as applicable, <br />assist in securing applicable incentives for measures listed in this Scope of Work . <br />• Since the incentive is actually paid for by a third party (Southern California Edison), <br />Contractor cannot guarantee that the City will receive the incentive. Contractor will as- <br />sist in providing the documentation needed for incentive application. <br />• Participate in meetings, inspections and site walkthroughs to satisfy incentive require- <br />ments <br />1.3. START-UP, TESTING AND COMMISSIONING <br />• Provide start-up and testing for new installed equipment based on manufacturer's spe- <br />cifications <br />• Provide commissioning to ensure proper functioning of new installed equipment and <br />adherence to contracted operating parameters and sequences. <br />1.4. COMPLETION <br />• Participate in punch-list walkthroughs with Building Superintendent and Park Superin- <br />tendent and ensure completion of punch-list items to satisfaction of Building/ Park Su- <br />perintendent, as applicable. <br />• Contractor will be responsible for final job site clean-up as it relates to Contractor <br />Scope of Work. <br />• Generate as-built plans and provide to City. <br />1.5. DELIVERABLES <br />• A detailed project schedule shall be submitted within 30 days after the NTP <br />• A safety plan and submittal package shall be submitted within 30 days after the NTP <br />• Copies of rebate paperwork <br />25D-39 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.