Laserfiche WebLink
APPENDIX A Proposal Response Form <br />(Concluded) <br />Sample Job #2: <br />Scope of Work: Contractor shall provide and install one (1216}-multi-mode /single mode, <br />fiber optic cable running from the basement Equipment Room ER6.2 to the 8~' floor <br />Telecommunications Close# TC8.1. Fiber optic cable will terminate in ERB.2 onto an <br />appropriately configured Lucen# LGX Fiber Optic Distribution System, using an LST10- <br />072/7 shelf with ST-type connectors. In TC8.1, fiber optic cable should terminate onto an <br />appropriately configured Lucent Sliding Combination~Sheif, using a 60062 One-Unit High <br />type shelf with ST-type connec#ors. Rack space required exists at both termination points. <br />One, empty 4-inch conduit exists between ERB.2 and TC6.1 {the Basement <br />Telecommunications Closet that is vertically stacked with the res# of the floors including <br />our destination closet, TC$.1). Contractor shall provide and install {4} one inch, non- <br />plenum, corrugated innerduct from ERB.2 to TCB.1 via existing 4-inch conduit noted <br />above which is 150 ft in leng#h. At exit point of conduit, #ransition {1 } of {4) installed <br />innerduct #o (1}one inch, riser-rated, corrugated innerduct, which will traverse from the <br />basement, stacked Telecommunications Clase#, TCB.1, up to TC8.1. Contractor shat! <br />provide (1} 4-inch core hole between TCB.1 and TC1.1. Building Facilities Management <br />has determined that floor is clear of obstruction for 4-inch core. Core hole shall be <br />sleeved, and fire stopped per local, state, and industry standard codes. <br />1) Provide a breakdown of hours to be billed. <br />.Place Cable 96.89 <br />Terminate sta#'son 3.90 <br />Terminate closet 3.90 <br />Test 1.80 <br />Total Hours 26.49 <br />2) Provide a breakdown of cost of materials. <br />See attached pricing sheet. <br />3) Provide details and amounts of any and all other charges that would be billed to the <br />City. <br />See attached pricing sheet. - <br />4) Provide approximation of. elapsed time to complete work, beginning from authorization <br />to final acceptance. <br />Five t5} to Ten (10) days <br />Page 23 of 36 <br />251-18 <br />