My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-09-08
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
FULL PACKET_2009-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 4:41:56 PM
Creation date
9/2/2009 2:44:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/8/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan <br />meter readings indicating safe removal of manhole lids. Once the location is deemed safe, <br />the manhole lid is removed. <br />The operator enters necessary line identification information including, manhole number, <br />line ID number, and pipe material & size into data base. The camera is then placed on the <br />ground next to the open manhole. Using the camera view, the operator records the visual <br />inspection of the rungs, the cone and shaft, in- coming and out going lines to assess <br />condition. The operator lowers the camera into the channel to record and view the invert <br />of the pipe. <br />Once the invert view is recorded, the video equipment is set -up for inspection of the line. <br />The operator's voice is recorded reading the video overlay. The operator controls the / <br />camera in the line to video all views and is responsible for proper camera height and ✓ <br />lighting. Pipe defects such as, breaks, cracks, off -set joints, roots, grease, infiltration and <br />ex- filtration are noted in audio and through data entry. Defects are archived as Jpeg files. <br />Other observations such as service connections, break -in connections and protruding taps <br />are also noted. <br />This process is repeated for each line segment. <br />Quality Contro]V%ta Conversion <br />All recordings are stored on a removable, digital hard drive which consists of videos, / <br />Jpegs and a Microsoft Access database for the inspected work and are delivered to the V <br />Houston & Harris Quality Control Department daily. <br />Every line inspected is checked for quality, accuracy and confirms all contract <br />requirements are met. <br />Data inserted in the database is checked for accuracy, compared to the City's Map an <br />an Excel Spreadsheet, supplied by the City, which includes all line segments for the <br />entire sewer system. During this process we check the wash logs ensuring they match thq� <br />sewer lines inspected that particular day. Once all data is verified to be correct the QC ✓/ <br />process begins. <br />Our QC tech views each video in its entirety first checking for proper lighting and <br />centering of the camera. The video must have a clear picture, free of any kind of <br />distortion or interferences and the audio must be clear and concise. Every Iine must als?, <br />begin with a view of the open manhole proceeding uninterrupted in the downstream <br />direction with the insertion of the camera into the manhole. <br />All sewer lines are inspected using NASSCO's standard coding system During the QC <br />process all lines are checked for the proper logging of each defect. All defects must be <br />accurately coded using the proper NASSCO code, o -clock position(s) and footage. The <br />inspection shall include location of all laterals, cracks, roots, <br />filtration and other conditions pertaining to the sewer line. If during thenfilt prose ex, <br />g QC process the <br />10 <br />25A -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.