Laserfiche WebLink
ENERGY RETROFITS/FACILITIES AND PARKS <br />Exhibit 1 <br />25D -4 <br />South West Senior Center <br />Replace 6 package units <br />$153,561 <br />7,247 <br />Bowers Museum <br />Lighting Retrofit - Convert T -12 and 1st <br />generation T -8 to 3`d generation T -8 <br />HVAC Upgrade — Replace 2 pac ag <br />Units <br />$74,277 <br />$69,193 <br />36,296 <br />7,685 <br />Trans ortation Center <br />Install controls for the fan coil units and <br />integrate with Siemens control system <br />Lighting etro i - onver - an <br />magnetic ballasts to 3rd generation T -8 <br />wlelectronic ballasts. Retrofit T-8 lamps <br />to 3rd generation T -8. Change <br />incandescent to CFL. Install motion <br />sensors <br />$ <br />$23,985 <br />36 410 <br />' <br />501245 <br />Fire Stations 1 -10 <br />Lighting Retrofit — Convert T -12 and 151 <br />generation T -8 to 3`d generation T -8 <br />Replacel l packaged units <br />$199,862 <br />$273,861 <br />116,148 <br />14,580 <br />Parks and i n <br />InteriodExterior Lighting Retrofit <br />Ball Field Sub - Metering <br />Musco Lighti Controls <br />=$723,074 <br />218,610 <br />NIA <br />165,420 <br />T <br />$3,267,500 <br />781,423 <br />Exhibit 1 <br />25D -4 <br />