My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-09-08
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
09/08/2009
>
FULL PACKET_2009-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 4:41:56 PM
Creation date
9/2/2009 2:44:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/8/2009
Destruction Year
2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A City of Santa Ana <br />Scope of Work Phase II <br />Siemens Building Technologies, Inc. <br />• Operation and Maintenance (O &M) manuals for new installed equipment <br />• A final drawing package corrected to as -built conditions on CD and 3 paper copies will <br />be submitted when field conditions and changes are incorporated prior to project close- <br />out <br />• Warranties and guarantees provided by Siemens, sub - contractors and manufacturers <br />• Contractor will provide two -hour training sessions for up to two (2) Building Mainten- <br />ance employees on operation and maintenance of each of the following systems: <br />Musco Controls <br />Siemens Controls; and <br />Ice Bear. <br />25D -40 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.