Laserfiche WebLink
APPENDIX A Proposal Response Form <br />(Concluded) <br />Sample Job #2: <br />Scope of Work: Contractor shall provide and install one (1216)- multi -mode / single mode, <br />fiber optic cable running from the basement Equipment Room ERB.2 to the 8 floor <br />Telecommunications Closet TC8.1. Fiber optic cable will terminate in ERB.2 onto an <br />appropriately configured Lucent LGX Fiber Optic Distribution System, using an LST10- <br />072/7 shelf with ST -type connectors. In T08.1, fiber optic cable should terminate onto an <br />appropriately configured Lucent Sliding Combination Shelf, using a 60062 One -Unit High <br />type shelf with ST -type connectors. Rack space required exists at both termination points. <br />One, empty 4 -inch conduit exists between ERB.2 and TCB.1 (the Basement <br />Telecommunications Closet that is vertically stacked with the rest of the floors including <br />our destination closet, TC8.1). Contractor shall provide and install (4) one inch, non - <br />plenum, corrugated innerduct from ERB.2 to TCB.1 via existing 4 -inch conduit noted <br />above which is 150 ft in length. At exit point of conduit, transition (1) of (4) installed <br />innerduct to (1) one inch, riser - rated, corrugated innerduct, which will traverse from the <br />basement, stacked Telecommunications Closet, TCB.1, up to TC8.1. Contractor shall <br />provide (1) 4 -inch core hole between TCB.1 and TC1.1. Building Facilities Management <br />has determined that floor is clear of obstruction for 4 -inch core. Core hole shall be <br />sleeved, and fire stopped per local, state, and industry standard codes. <br />1) Provide a breakdown of hours to be billed. <br />Place Cable 16.89 <br />Terminate station 3.90 <br />Terminate closet 3.90 <br />Test 1.80 <br />Total Hours 26.49 <br />2) Provide a breakdown of cost of materials. <br />See attached pricing sheet. <br />3) Provide details and amounts of any and all other charges that would be billed to the <br />City. <br />See attached pricing sheet. <br />4) Provide approximation of elapsed time to complete work, beginning from authorization <br />to final acceptance. <br />Five (5) to Ten (10) days <br />Page 23 of 36 <br />251 -18 <br />