My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-10-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
10/05/2009
>
FULL PACKET_2009-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:15:51 PM
Creation date
10/1/2009 7:39:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/5/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TWO-YEAR REIMBURSEMENT AGREEMENT <br />BETWEEN <br />IRVINE RANCH WATER DISTRICT <br />AND THE CITY OF SANTA ANA <br />FOR THE INSTALLATION OF <br />MISCELLANEOUS FACILITIES <br />(2009, 2010) <br />This Agreement is made and entered as of this day of , 2009, <br />by and between IRVINE RANCH WATER DISTRICT, a California Water District formed and <br />existing pursuant to California Water District Law, hereinafter referred to as "IRWD," and the <br />CITY OF SANTA ANA, a municipal corporation, hereinafter referred to as "CITY." <br />WITNESSETH <br />WHEREAS, City periodically undertakes street improvement projects, a number of <br />which involve concurrent construction, modification or relocation of water, sewer and/or <br />reclaimed water facilities of IRWD in the vicinity of the respective projects; and <br />WHEREAS, the parties have determined that for certain projects, to be mutually <br />designated by CITY and IRWD staff (each, a "Project" and collectively, the "Projects"), it would <br />be more efficient for CITY, rather than IRWD, to carry out the design, construction, <br />modification or relocation of the affected water, sewer and/or reclaimed water facilities of IRWD <br />("IRWD FACILITIES") due to the particular alignment and construction scheduling of IRWD <br />FACILITIES; and <br />WHEREAS, the parties desire to enter into a master reimbursement agreement covering <br />all Projects initiated during the term of such master agreement that involve an estimated IRWD <br />FACILITIES construction cost of less than $100,000 per Project; and <br />WHEREAS, IRWD is amenable to the construction of IRWD FACILITIES by CITY at <br />CITY's cost, which cost is to be reimbursed to CITY by IRWD as provided herein; and <br />WHEREAS, all IRWD FACILITIES shall be the property of IRWD in accordance with <br />the terms and conditions hereinafter set forth; <br />Revised 12/22/04 <br />25E13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.