My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2009-10-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
10/19/2009
>
FULL PACKET_2009-10-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:15:26 PM
Creation date
10/14/2009 12:21:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/19/2009
Destruction Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />I. CONTRACTOR'S RESPONSIBILITIES - <br />A. Work Assignments <br />1. Contractor will provide graffiti removal services for all streets, sidewalks, private and public property, <br />parks, bike trials, flood channels, civic center and right-of--ways, located within city limits. <br />2. The Contractor shall contact the Project Manager and/or his/her designee each weekday, at a mutually <br />agreed upon time, to discuss the Contractor's schedule for the day, pending work orders, areas to be <br />maintained and areas to be inspected for approval. Weekend work orders will be assigned on Friday. <br />3. The Contractor shall receive work orders from the Project Manager and/or his/her designee via <br />electronic mail or facsimile, or written as agreed upon by the Project Manager and/or his/her designee and <br />the Contractor. <br />4. Upon receipt of a work order, the Contractor shall inspect the location and determine the method of <br />removal according to the PWA Graffiti Removal Standards, attached hereto as Attachment 1, which will <br />maintain the integrity of the surface. <br />5. The Contractor shall provide services within twenty-four (24) hours of receiving work orders. In the <br />event that a site cannot be abated within twenty-four (24) hours due to inclement weather, size of the site <br />or any other reason, the Contractor shall notify the Project Manager and/or his/her designee with the <br />status of the site prior to the end of the twenty-four (24) hour timeline. <br />6. Work may be assigned as a targeted graffiti route with graffiti removal. As directed by the Project <br />Manager and/or his/her designee, the Contractor shall be assigned to schedule visits to specified sites, <br />neighborhoods or corridors. The Contractor may be required to work with a site, neighborhood or corridor <br />liaison in addition to the Project Manager and/or his/her designee. <br />7. The Contractor shall meet with the Project Manager and/or his/her designee one time per week at a <br />mutually agreed upon time to discuss program status and issues. <br />8. The Project Manager and/or his/her designee or the Police Department may designate sites as needing <br />an emergency response. An emergency work order will be issued immediately. Emergency response sites <br />will have first priority and may require abatement on the same day. <br />9. The Contractor shall deliver completed work orders to the Project Manager and/or his/her designee via <br />electronic mail, facsimile, mail or in person on, or prior to, the first working day of the week following <br />assignment of the work order. Accommodations for special projects may be made. <br />10. Work on private properly shall not be performed without the Consent form signed by the owner or <br />authorized by the Project Manager and/or his/ her designee. The Contractor shall obtain the signature of <br />the property owner on the consent form prior to beginning work. Original consent forms shall be returned <br />to the Project Manager and/or his/her designee on a weekly basis and are property of the City. The City <br />will maintain a database of Consent Forms. <br />B. Description of Work <br />1. The method of removal shall not leave shadows or ghosts and shall not follow the pattern of the graffiti <br />such that letters or shapes remain apparent on the surface after markings have been removed. <br />2. Unless otherwise approved by the Project Manager and/or his/her designee, graffiti shall be removed so <br />that virtually no trace of the pre-existing graffiti remains. <br />3. The Contractor shall protect the surfaces adjacent to the area to be abated. <br />7 <br />25B-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.