My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55D - BIKEWAYS STRATEGIC PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2009
>
11/02/2009
>
55D - BIKEWAYS STRATEGIC PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 11:22:16 AM
Creation date
10/29/2009 10:48:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Identify the Water Channel E/O Raitt Street between Occidental Street and Alton as a <br />Proposed Class I bikeway in Map 1.1 and Exhibit: Orange County Bikeway Map / Section <br />3 in Appendix 4. <br />4. Add the Alton /Maple Union Pacific Class I bikeway to Map 1. 1, Map 1.2, Exhibit Orange <br />County Bikeway Map / Section 3 and Section 4 in Appendix 4. <br />5. Add a Proposed Class II bikeway on Memory Ln between Bristol Street and Santa Ana <br />River to Exhibit: Orange County Bikeway Map / Section 4. <br />6. Identify Bristol Street as a Proposed Class II bikeway in Map 1.1. <br />7. Identify Grand Avenue as a proposed Class II bikeway in Map 1.1. <br />8. Past Expenditures for bicycle facilities include: <br />• Flower Street Bike Trail Extension. The project consisted of the installation of a <br />10' wide bike trail, landscaping and supporting irrigation along a 1/2 mile length of <br />a flood channel which runs parallel along Flower Street. The project total cost was <br />$1111200. <br />• Santiago Creek Underpass. The project consisted of the installation of a bike trail <br />underpass to the 22 -fwy and Main Street. The project total cost was $ <br />• Carl Thornton Park Re- pavement. The project rehabilitated the bike trail going <br />through Carl Thornton Park. <br />• Alton Bike Trail. The project rehabilitated the pavement and enhanced the <br />landscape of the bike trail. <br />9. The City has no funding mechanism for improving or implementation new bicycle <br />facilities. The City relies on obtaining grant funding and providing matching fund to <br />leverage the limited available City funds. Overall, the City has a need for new bike <br />facilities in the corresponding financial need. <br />10. The following are "typographical" errors should be corrected on the specified pages <br />• Appendix Pagel 70: "Bristol" St. / La Veta Ave. <br />• Appendix Page 171: <br />17" St. <br />Garden Grove City Limit <br />"East" City Limit <br />"(Buena St.)" <br />(Deodar St.) <br />Sunflower Ave. <br />Costa Mesa City Limit <br />Costa Mesa City Limit <br />"(Bear St.)" <br />"(E Park Center)" <br />• Page 169: <br />Metrolink/Amtrak Santa Ana Station Bicycle racks <br />(18) /Lockers "(15)" <br />
The URL can be used to link to this page
Your browser does not support the video tag.